3 floors · 3 apartments · 2,962 sq ft · built 2008 · class C0 · owner of record: 1385 Stanley Holdings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 30, 2024 | Construction CLASS - 2 FAILURE TO CONDUCT/FILE A FINAL INSPECTION OF PERMITTED WORK WITH THE DEPARTMENT: FAILURE TO OBTAIN A FINAL SIGN OFF FOR PERMITTED WORK WITHIN 1 YEAR AS SET FORTH IN AC 28-116.4. DOB ALT-1 JOB # 302340606 OBTAI #39120269M | Oct 9, 2024 DEFAULT | $6,250 |
| Jul 30, 2024 | Construction CLASS - 1 BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY: ATOI SAID PREMISES WAS OBSERVED OCCUPIED FOR RESIDENTIAL OCCUPANCY WITHOUT A VALID CO ON FILE WITH THE DEPT. OF BUILDINGS. NO CO ISSUED FOR ALT-1 JOB #39120270J | Oct 9, 2024 DEFAULT | $12,500 |
| Feb 18, 2022 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35401713P ISSUED ON 5/29/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR ALTERED/CHANGED BUI #35568455X | Jul 6, 2022 DEFAULT | $3,125 |
| Mar 12, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS.VIOLATION#35401713P ISSUED ON 05-29-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 ALTERED CHANGED BUILDINGS #35527887Z | Jul 21, 2021 DEFAULT | $3,125 |
| Nov 25, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/ COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35401713P ISSUED ON 5/29/19 & TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1&1RCNY102-01.ALTERED CHANGE.COMPLY W/ COMMISSIONER'S #35524371Y | Apr 7, 2021 DEFAULT | $3,125 |
| Sep 4, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35401713P ISSUED ON 05/29/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102.01. FOR VALID C OF O. REMEDY: COMPLY W/COMM'S ORDER &/O #35519969M | Jan 13, 2021 DEFAULT | $3,125 |
| Jan 3, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35401713P ISSUED ON 05-29-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. ALTERED CHANGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118. #35515236R | Nov 9, 2020 DEFAULT | $3,125 |
| Nov 14, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35401713P ISSUED ON 05-29-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. ALTERED/CHANGED BLDG OCCUPIED W/O A VALID CERT OF OCCUPANCY AS #35512243L | Sep 11, 2020 DEFAULT | $3,125 |
| Sep 23, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35401713P ISSUED ON 05-29-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR OCCUPANCY BLDG,W/O A VALID CERT OF OCCUPANCY. REMEDY: COMPL #35429312Z | Jan 29, 2020 DEFAULT | $3,125 |
| Aug 8, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35401713P ISSUED ON 05-29-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35427042Z | Dec 9, 2019 DEFAULT | $3,125 |
| May 29, 2019 | Construction CLASS - 1 ALTERED CHANGED BUILDING OCCUPIED WITHOUT A VALID COFO AS PER 28-118.3.2.NOTED JOB #302340606 NB HAS NOT BEEN SIGNED OFF AND ITS OCCUPIED ON2ND AND 3RD FLOOR.REM:OBTAIN A VALID COFO OR DISCONTINUE ILLEGAL USE #35401713P | Sep 16, 2019 DEFAULT | $25,000 |
| Mar 11, 2019 | Construction CLASS - 1 ALTERED CHANGED BUILDING OCCUPIED W/O A VALID C OF O AS PER 28-118.3.2. RECORDS JOB#302340606 NB HAS SIGNED OFF AND IT'S OCCUPIED ON 2ND+3RDFLOORS,(1)CAR ON DRIVEWAY/GARAGE. REMEDY:OBTAIN VALID C OF O OR DISCON #35401928M | Jun 24, 2019 DEFAULT | $25,000 |
| Jan 9, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35345990J ISSUED ON 07/23/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.ALTERED CHANGED BUILDING #35393911Z | Apr 15, 2019 DEFAULT | $3,125 |
| Nov 29, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35345990J ISSUED ON 07-23-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR OCCUPANCY BLDG W/O A VALID CERT OF OCCUPANY. REMEDY: COMPLY #35391941K | Jun 10, 2019 DEFAULT | $3,125 |
| Oct 16, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35345990J ISSUED ON 07-23-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: ALTERED CHARGED BNLDG OCCUPIED W/O A VALID C/O. #35390488R | Jan 7, 2019 DEFAULT | $3,125 |
| Sep 4, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35345990J ISSUED ON 07-23-18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. NOTE: NO DOCUMENT FILE FOR VALID CERT OF OCCUPANCY UNDER JOB# #35388380M | Nov 26, 2018 DEFAULT | $3,125 |
| Jul 23, 2018 | Construction CLASS - 1 ALTERED CHANGED BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.3.2. NOTE: JOB#302340606 NB WAS NOT SIGNED OFF & THE BLDG IS OCCUPIED. REMEDYOBTAIN A VALID C OF O OR DISCONTINUE USE. #35345990J | Oct 1, 2018 DEFAULT | $12,500 |
| Jun 16, 2018 | Construction CLASS - 1 ALTERED CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1;28-118.3.2.NOTED:JOB#302340600NB WAS NOT SIGNEDOFF,AND THE BUILDING IS OCCUPIED.REM:OBTAIN A VALID C OF O OR DISCONTI #35331695J | Aug 20, 2018 DEFAULT | $12,500 |
| Mar 8, 2018 | Construction CLASS - 1 ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C OF O. NOTED: JOB#302340600NB WAS NOT SIGNED OFF & BLDG IS OCCUPIED. REMEDY: OBTAIN A VALID C OF O. #35309389K | Apr 30, 2018 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 9, 2025 | CONSTRUCTION BUILDING IS OCCUPIED WITHOUT A CERTIFICATE OF OCCUPANCY, NB JOB# 302340606 IS NOT SIGNED OFF. #25-00790 | DOB VIOLATION - ACTIVE |
| Aug 22, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00621 | DOB VIOLATION - ACTIVE |
| Jun 26, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #01219 | DOB VIOLATION - ACTIVE |
| Oct 31, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00874 | DOB VIOLATION - ACTIVE |
| Sep 5, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00424 | DOB VIOLATION - ACTIVE |
| May 30, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00456 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Aug 22, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 26, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 31, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 5, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| May 30, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 1, 2021 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 8, 2021 |
| May 2, 2019 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 6, 2019 |
| Apr 30, 2019 | C | Apt 2 · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 30, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 1:21 PM ET. BBL 3045180130.