Brooklyn · Block 6746 · Lot 63 · 11230

1383 East 17 Street

2 floors · 1 apartments · 1,548 sq ft · built 1930 · class A9 · owner of record: Living Prophecy Llc

16open violations
$57,850ECB/OATH penalties owed
0HPD class C (immediately hazardous)
289dto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 289 days
Required only if the owner doesn't live there

Open violations

ECB / OATH (16) · $57,850 owed
IssuedViolationHearingBalance
Jan 14, 2026Construction CLASS - 2
ATOI, OBSERVED TWO FAMILY DWELLING UNDERGOING FULL STRUCTURAL REHABILITATION, CONSTRUCTION SITE OPEN AND UNGUARDED, CONSTRUCTION FENCE ERECTED AROUND THE PROPERTY, CONSTRUCTION FENCE AND MAIN ENTRY DOOR INTO TH
#39173997J
Dec 14, 2026
$5,000
Jan 14, 2026Construction CLASS - 2
WORK WITHOUT PERMIT. ATOI, OBSERVED TEMPORARY CONSTRUCTION FENCING ERECTED AT THE FRONT, REAR, AND SIDES OF THE PROPERTY, ENCLOSING THE SITE AND SAFEGUARDING THE PUBLIC, WITH NO ACTIVE PERMIT ON RECORD; SUCH FE
#39173998L
Dec 14, 2026
PENDING
$1,250
Dec 4, 2025Construction CLASS - 1
WORK WAS PERFORMED BEYOND THE ALLOWED EXCEPTION PROVIDED BY CSE, TO THE POSTED STOP WORK ORDER. ALLOWED WORK WAS TO PROVIDE SHORING OF FLOORS AND INSTALL PLYWOOD TO FACILITATE ABATEMENT AND DEBRIS REMOVAL. WORK
#39169292H
Mar 25, 2027
PENDING
$10,000
Dec 4, 2025Construction CLASS - 1
OBSERVED NONCOMPLYING CONSTRUCTION FENCE. HEIGHT BUILT IS APPROX10' EXCEEDING THE ALLOWED 8'. ALSO ENTRY GATE SWINGS OUTWARD INTO THE SIDEWALK. POTENTIAL FOR INJURY TO THE PUBLIC/PEDESTRIANS. COMPLY WITH BC3307
#39169291X
Mar 25, 2027
$2,500
Dec 3, 2025Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN VIOLATION #112625CE31401JR WITH ASSOCIATED CONTROL #376428 ISSUED ON 11/26/25. THE REMEDY FOR THE COMMISSIONER'S ORDER MANDATED THE STRUCTURAL STABILITY
#35650513H
Mar 25, 2027
PENDING
$2,500
Dec 3, 2025Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN VIOLATION #112525CE31491PW WITH ASSOCIATED CONTROL #3766339 ISSUED ON 11/25/25. THEREMEDY FOR THE COMMISSIONER'S ORDER MANDATED THE SUBMISSION OF THE STA
#35650512X
Mar 25, 2027
PENDING
$2,500
Nov 20, 2025Construction CLASS - 1
OBSERVED NEW FRAOMING AT REAR OF PROPERTY AT EXP 3 AND 4 CORNER. NEW EXTERIOR WALL FRAMED, NEW FLOOR FRAMED. BOTH SHEATHED WITH PLYWOOD. NEW LVL HEADER INSTALLED AT SECOND FLOOR FRAMING. EXISTING JOISTS WERE CU
#39167740N
Feb 2, 2027
PENDING
$10,000
Nov 20, 2025Construction CLASS - 1
OBSERVED NEW CONCRETE FOUNDATION AT THE CORNER OF EXP 3 AND 4. EXPOSED SECTION IS APPROX 3'H X 16'L. NO PLANS NO FILE NO DETAILS ON FOOTINGS, REINFORCMENT ETC. STRUCTURAL WORK IS UNKNOWN. ALSO ON SECOND FLOOR A
#39167731L
Feb 2, 2027
PENDING
$2,500
Nov 20, 2025Construction CLASS - 1
OBSERVED EXCESSIVE CONSTRUCTION DEBRIS THROUGHOUT THE PROPERTY. LARGE PILE IN REAR YAD EXP 3. APPROX 5 YDS. INSIDE PILES OF DEBRIS SITTING ON OPEN FLOOR JOISTS FROM NEW CONST AND DEMO OF OLD EXTERIOR WALL. CELL
#39167742R
Feb 2, 2027
$2,500
Nov 19, 2025Construction CLASS - 1
ATOI OBSERVED FAILURE TO COMPLY WITH COMMISSIONER'S ORDERS FOR OWNER TO HIRE A NYSPE AND SUBMIT A REPORT WITHIN 5 DAYS, COMPLY WITH COMMISSIONER'S ORDER
#39167555L
Feb 2, 2027
PENDING
$2,500
Nov 13, 2025Construction CLASS - 1
AT REAR YARD EXP 3 LARGE PILE OF CONST DEBRIS. CONSISTING OF WINDOWS, WOOD, BLACK BAGS METAL ETC. APPROX 5 YDS., REPAIR AND/REPLACE
#39166952K
May 3, 2027
$2,500
Nov 13, 2025Construction CLASS - 1
AT CELLAR INTERIOR STAIRS THERE ARE NO TEMP HANDRAILS OR GAURDRAIL TO PREVENT FALLS DOWN STAIRS OR INTO CELLAR. POTENTIAL FOR FALL AND SERIOUS INJURY., REPAIR AND/REPLACE
#39166954Y
May 3, 2027
$2,500
Nov 13, 2025Construction CLASS - 1
OBSERVED UNPERMITTED/UNDOCUMENTED STRUCTURAL WORK AT REAR OF PROPERTY EXP 3 AND 4. UNPERMITTED/ UNDOCUMENTED REMOVAL OF REAR WALL. CONSTRUCTION OF 2X4 WALL TO SUPPORT SECOND FLOOR CANTILEVER THAT IS SUPPORTING
#39166963X
May 3, 2027
PENDING
$2,500
Nov 13, 2025Unknown CLASS - 1
OBSERVED FULL DEMO OF ELECTRICAL. AT CELLAR YELLOW ROMEX FOR TEMP POWER RAN FROM PANEL. ALSO OTHER BX CABLES RAN., OBTAIN PERMIT
#39166953M
May 3, 2027
PENDING
$1,600
Nov 13, 2025Construction CLASS - 1
OBSERVED FULL GUT RENOVATION. AT REAR OF HOUSE NEW EXTERIOR WALL BEING BUILT. 2X4 STUDS AND PLYWOOD., OBTAIN PERMIT
#39166950R
May 3, 2027
PENDING
$2,500
Nov 13, 2025Construction CLASS - 1
OBSERVED GUT DEMOLITION OF PROPERTY. ALL INTERIOR WALLS, SUBFLOOR, EXTERIOR WALL AT REAR COMLETELY REMOVED. WOOD JOISTS EXPOSED THROUGHOUT., OBTAIN REQUIRED DEMOLITION PERMIT
#39166951Z
May 3, 2027
PENDING
$5,000
DOB (5)
IssuedViolationStatus
Nov 26, 2025CONSTRUCTION
STRUCTURAL STABILITY-UNPERMITTED EXTENSION/RENOVATION. STABILITY AND FIRE PROTECTION COMPROMISED. PUBLIC HAZARD REMEDY: FAIL TO COMPLY WITH COMMISSIONER'S ORDER # 112425CE31401PW COMPLY W CODE, PROVIDE REQUIRED STRUCTURAL STABILITY REPORTS BY 11/28/ 25, AND THEN TWICE PER WEEK THEREAFTER. CONTROL #
#CE31401JR
DOB VIOLATION - ACTIVE
Nov 25, 2025CONSTRUCTION
EMERGENCY WORK - UNPERMITTED EXTENSION/RENOVATION. STABILITY & FIRE PROTECTION COMPROMISED. PUBLIC HAZARD. CONTROL # 376339 REMEDY: COMPLY W CODE.HIRE NYS PE,CS,ASBTS GC FOR IMEDITE STRL STBLZ PE PLANS DUE 112025@2PM.WRK STARTS 1121. FILE W/IN 2 BUS DAYS
#CE31401PW
DOB VIOLATION - ACTIVE
Nov 24, 2025CONSTRUCTION
STRUCTURAL STABILITY-UNPERMITTED EXTENSION/RENOVATION. STABILITY & FIRE PROTECTION COMPROMISED. PUBLIC HAZARD. CONTROL #376338 REMEDY: FAILURE TO COMPLY W COMMISSIONER'S ORDR # 112425CE31401PW COMPLY W CODE,PROVID REQ STRCTL STABLTY RPTS BY112825,2X/WK THEREAFTR
#CE31401PW
DOB VIOLATION - ACTIVE
Nov 20, 2025CONSTRUCTION
EMERGENCY WORK - UNPERMITTED EXTENSION/RENOVATION. STABILITY & FIRE PROTECTION COMPROMISED. PUBLIC HAZARD. REMEDY: COMPLY W CODE.HIRE NYS PE,CS,ASBTS GC FOR IMEDITE STRL STBLZ PE PLANS DUE 112025@2PM.WRK STARTS 1121. FILE W/IN 2 BUS DAYS
#CE31401PW
DOB VIOLATION - ACTIVE
Nov 13, 2025CONSTRUCTION
UNPERMITTED/ UNDOCUMENTED REMOVAL OF REAR WALL. CONSTRUCTION OF 2X4 WALL TO SUPPORT SECOND FLOOR CANTILEVER THAT IS SUPPORTING EXTERIOR WALL. FOUNDATION DETAILS FOR NEW WALL BUILT AT EXP 3 AND 4.
#25-02615
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 16, 2026, 12:23 PM ET. BBL 3067460063.

Look up another building