1 floors · 1,679 sq ft · built 1958 · class G4 · owner of record: Leemilts Petroleum Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 12, 2024 | Construction CLASS - 2 OBSERVED IN EL SALVADOR AUTO REPAIR NEXT TO THE GAS METER HEATER VENT IS NOT CONNECTED ALSO FUTURE ON GAS LINE WHICH IS CONTRARY TO FGC SECTIONS 404.15 AND 503.3, REPAIR AND/OR REPLACE #39105765X | Apr 19, 2024 DEFAULT | $3,125 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 1:04 PM ET. BBL 2025210015.