5 floors · 10 apartments · 7,650 sq ft · built 1915 · class D3 · owner of record: 138 East 16 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-02 (Accepted). Agency page | Dec 31, 2026 in 43 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 287 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 31, 2026 | Elevators CLASS - 1 VF... CEASE USED... ALARM AND COMMUNICATION DEFECTIVE ...REPAIR ALARM AND COMMUNICATION , CONTACT DOB AT EIR @NYC GOV 2123932435.. TO RETURN DEVICE TO SERVICE... 2.L.10... .. 8.6.4.15... CAR SILL AND HOIST WAY #39202378K | Nov 5, 2026 DEFAULT | $1,280 |
| Jul 30, 2026 | Elevators CLASS - 2 VF.. HOIST MACHINE BRAKE MAINTENANCE TAG EXPIRED PROVIDE...8.6.4.6.... MAINTENANCE LOG UPDATE MISSING PROVIDE.. 8.6.4.1.... CAT 5 TAG EXPIRED PROVIDE. 8.6.4.1.... CAT 1 TEST TAG EXPIRED PROVIDE.. 8.6.1.4...MACH #39198513P | Dec 3, 2026 PENDING | $625 |
| Dec 12, 2024 | Elevators CLASS - 1 98/BB/7 CAT 5 EXPIRED PROVIDE TEST, 2/X/10 OUT SIDE COMM INOPERATIVE REPAIR. #39132761M | Feb 20, 2025 DEFAULT | $6,250 |
| Jun 12, 2024 | Elevators CLASS - 1 IN-CAR COMMUNICATION IS NOT WORKING PROPERLY, NEED TO REPAIR. CAR SADDLE TO HALL SADDLE IS NOT LEVEL ON MULTIPLE FLOORS CREATING A TRIPPING HAZARD, NEED TO ADJUST FLOOR STOPS. REQUIRED SIGNAGE STATING "IN CASE #39116590R | Aug 22, 2024 DEFAULT | $6,250 |
| Feb 22, 2023 | Elevators CLASS - 1 EMERGENCY PHONE NOT WORKING; DOOR RESTRICTOR NOT OPERATING PROPERLY #39080150L | May 4, 2023 IN VIOLATION | $1,250 |
| Feb 22, 2023 | Elevators CLASS - 1 PHONE NOT WORKING IN ELEVATOR;REPAIR; FIRE EXTINGUISHER EXPIRED; DOOR RESTRICTOR NOT WORKING PROPERLY #39080351H | Jul 6, 2023 IN VIOLATION | $1,250 |
| Oct 13, 2022 | Elevators CLASS - 1 1 . ELEVATOR IN BUILDING OUT OF SERVICE. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT-OF-SERVICE CREATING A HAZARDOUS . REMEDY:RESTORE TO SERVICE IMMEDIATELY AND, NOTIFY NYCDOB THE DEVICE HAS BEEN RETURNED TO #39071930H | Sep 28, 2023 IN VIOLATION | $1,250 |
| Mar 2, 2021 | Construction CLASS - 2 WORK W/O PERMIT OBSERVED@ROOF ILLEGAL ROOF DECK HAS BEEN ERECTED.DECK APPROX15X15' W/WOOD FLOORING&WOOD SIDES ALSO ON ROOF,OBSERVED NEWLY/RECENTLY INSTALLED ROOF FL OPENING W/DOOR LEADING TO DOWNSTAIRS APT WORK #35441785K | Apr 7, 2022 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00305 | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00304 | DOB VIOLATION - ACTIVE |
| Feb 26, 2020 | ELEVATOR #9028/673301 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #01804 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #01773 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #01969 | DOB VIOLATION - ACTIVE |
| May 30, 2014 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST #01841 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| May 30, 2014 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 18, 2024 | A | Apt 2A · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ALL RADIATORS IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 23, 2025 |
| Dec 18, 2024 | A | Apt 2A · § 27-2005 ADM CODE REFIT THE LOWER SASHES OF BOTH WINDOWS ON THE NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 23, 2025 |
| Dec 18, 2024 | A | Apt 2A · § 27-2005 ADM CODE REFIT THE LOWER SASH OF THE NORTH WALL WINDOWS IN THE 2nd ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 23, 2025 |
| Jul 15, 2022 | C | Apt 2A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM WEST AT NORTH WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL IN | Aug 8, 2022 |
| Mar 12, 2021 | C | Apt 2A · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM WEST AT NORTH WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL IN | Apr 5, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 31, 2026 | ECB | Elevators: VF... CEASE USED... ALARM AND COMMUNICATION DEFECTIVE ...REPAIR ALARM AND COMMUNICATION , CONTACT DOB AT EIR @NYC GOV 2123932435.. TO RETURN DEVICE TO SERVICE... 2.L.10... .. 8.6.4.15... CAR SILL AND HOIST WAY | Open |
| Jul 30, 2026 | ECB | Elevators: VF.. HOIST MACHINE BRAKE MAINTENANCE TAG EXPIRED PROVIDE...8.6.4.6.... MAINTENANCE LOG UPDATE MISSING PROVIDE.. 8.6.4.1.... CAT 5 TAG EXPIRED PROVIDE. 8.6.4.1.... CAT 1 TEST TAG EXPIRED PROVIDE.. 8.6.1.4...MACH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 12:11 PM ET. BBL 1008710051.