3 floors · 6 apartments · 5,775 sq ft · built 1930 · class C2 · owner of record: Judah S. Niasoff, As Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-08-14 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 13, 2020 | Construction CLASS - 1 GAS PIPING INSTALLED TO PULL GAS FROM HEAT AND HOT WATER GAS SYSTEM TO SUPPLY GAS TO RESIDENTIAL COOKING GAS SYSTEM. NO PERMITS ON FILE WITH DOB, OBTAIN PERMIT #39022244R | Oct 28, 2021 IN VIOLATION | $2,500 |
| May 13, 2020 | Plumbing CLASS - 1 GAS PIPING INSTALLED TO PULL GAS FROM HEAT AND HOT WATER GAS SYSTEM TO SUPPLY GAS TO RESIDENTIAL COOKING GAS SYSTEM. NO PERMITS ON FILE WITH DOB THEREFORE NO INSPECTION OR CERTIFICATION BY DOB, FILE FOR REQUIRE #39022243P | Oct 28, 2021 IN VIOLATION | $5,000 |
| May 13, 2020 | Plumbing CLASS - 1 GAS PIPING INSTALLED TO PULL GAS FROM HEAT AND HOT WATER GAS SYSTEM TO SUPPLY GAS TO RESIDENTIAL COOKING GAS SYSTEM. NO PERMITS ON FILE WITH DOB THEREFORE THE NEW OR ALTERED SYSTEM HAS NOT BEEN PROPERLY TESTED, #39022245Z | Oct 28, 2021 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #06650 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #04591 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #04593 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #04592 | DOB VIOLATION - ACTIVE |
| May 13, 2020 | PLUMBING WORK WITHOUT A PERMIT ON GAS SYSTEM. OBSERVED CONDITION DOES NOT COMPLY WITH 28-105.1 OF THE ADMIN CODE AND PRESENTS AN IMMINENT RISK TO PUBLIC SAFETY. YOU ARE HEREBY ORDERED TO IMMEDIATELY CORRECT THE ABOVE CONDITION BY RETAINING A LIC. PROFESSIONAL TO PERFORM ALL WORK NECESSARY TO RESTORE THE NON- #20-00819 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #10094 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #11835 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #23332 | DOB VIOLATION - ACTIVE |
| Jun 1, 1994 | LOCAL LAW 62/91 - BOILERS #01363 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #19545 | DOB VIOLATION - ACTIVE |
| Jun 1, 1993 | LOCAL LAW 62/91 - BOILERS #01362 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Jun 1, 1994 | Boiler LL6291 | Active |
| Jun 1, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 10, 2008 | A | D26-10.01 ADM CODE REFIT DOOR BULKHEAD TO ROOF. | Sep 13, 2008 |
| Jun 10, 2008 | A | D26-12.03 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STYS FRONT & REAR OF BLDG. | Sep 13, 2008 |
| Jun 10, 2008 | A | D26-10.01 ADM CODE REFIT DOOR BULKHEAD ROOF. | Sep 13, 2008 |
| Jun 10, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CELOTEX CEILING & WOOD WALL PANELING CELLAR FRONT. | Sep 13, 2008 |
| Jun 10, 2008 | A | D26-12.03 ADM CODE PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EXTERIOR WINDOW FRAMES AND SASHES 1 STY FRONT APT. | Sep 13, 2008 |
| Jun 10, 2008 | A | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CELOTEX CEILING CELLAR FRONT. | Sep 13, 2008 |
| Jun 10, 2008 | A | SECTION 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STYS ALL PARTS REAR FIRE ESCAPE. | Sep 13, 2008 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 7:25 PM ET. BBL 3055990047.