Brooklyn · Block 1354 · Lot 1 · 11213

137 Schenectady Avenue

3 floors · 2 apartments · 4,000 sq ft · built 1901 · class S2 · owner of record: 137 Schenectady Llc

8open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 311 days
Required only if the owner doesn't live there

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (8) · C 0 · B 4 · A 4
IssuedClassViolationCorrect by
Aug 6, 2009ASECTION 27-2005 ADMIN. CODE: REFIT SASHES ALL WINDOWS, 3RD STORY APT.Nov 9, 2009
Aug 6, 2009ASECTION 27-2005 ADMIN. CODE: REFIT SASHES ALL WINDOWS, 2ND STORY APT.Nov 9, 2009
Aug 6, 2009ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOUT, 2ND STORY APT.Nov 9, 2009
Aug 6, 2009ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOUT, 3RD STORY APT.Nov 9, 2009
Aug 6, 2009BSECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE COVER AIR VENT CEILING BATHROOM, 2ND STORY APT.Sep 10, 2009
Aug 6, 2009BSECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN MICE AND ROACHES THROUGHOUT, 2ND STORY APT.Sep 10, 2009
Aug 6, 2009BSECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN MICE AND ROACHES THROUGHOUT, 3RD STORY APT.Sep 10, 2009
Aug 6, 2009BSECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING GLASS PANES ENTRANCE DOOR, VESTIBULE TO 1ST STORY PUBLIC HALL.Sep 10, 2009

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 7:34 AM ET. BBL 3013540001.

Look up another building