1 floors · 832 sq ft · built 1970 · class K1 · owner of record: Cross Bay Triangle Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 29, 2022 | Unknown CLASS - 2 INSTALLATION OF NEW HEAVY DUTY J-CORD WITH MALE AND FEMALE CONNECTION RAN FROM BUILDING TO FOOD TRUCK (EMPANADA ON THE RUN) USED FOR PERMANENT POWER SOURCE., OBTAIN PERMIT #39072986L | Dec 13, 2022 IN VIOLATION | $0 |
| Aug 12, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35360373J ISSUED ON 10/09/18, AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.01 AND 1RCNY 102-01(D)(2).AN ACCEPTIBLE CERTIF #37015523L | Feb 11, 2020 IN VIOLATION | $0 |
| Oct 9, 2018 | Construction CLASS - 2 WORK W/O A PERMIT. NOTED: INSTALLED A SIGN APPROX 40 FEET IN LENGTH & 8 FEET IN HEIGHT THAT READS(CRAFT BEER,LOTTO,CIGAR). ALSO INSTALLED AT EXP#4 SIGN APPROX 20FEET IN LENGTH & 5FEET IN HEIGHT.(CRAFT BEER FROM #35360373J | Dec 4, 2018 STIPULATION/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 6:55 PM ET. BBL 4113720080.