5 floors · 7 apartments · 22,169 sq ft · built 1898 · class D0 · owner of record: 136 Loft Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2025-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 49 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 49 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 49 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-07-18 (Accepted). Agency page | Dec 31, 2026 in 49 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 65 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 22, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION OBSERVED AT EXP 2 COURTYARD SOUTH ELEVATION, BROKEN WINDOW SILLS AT 2ND FLOOR LEVEL, ALSO OBSERVED MISSING MORTARS AT JOINTS #35730382R | Dec 31, 2026 PENDING | $6,250 |
| May 21, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. NOTED: OBSERVED AT EXP 3(S. ELEV) BROKEN WINDOWS SILLS AT 2ND FLOOR LEVEL. ALSO OBSERVED MISSING MORTARS AT JOINTS AT MULTIPLE LOCATIONS ON SAME EXPOSURE #35729738K | Jun 14, 2027 DEFAULT | $2,530 |
| Jul 2, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AS NOTED: AT THE TIME OF INSPECTION I OBSERVED ON EXPOSURE #1 NORTH ELEVATION: AT THE NORTH WEST END OF PARAPET, CORNICE ROTTED WITH LOOSE PIECE OF METAL #35693841R | Jan 8, 2026 IN VIOLATION | $2,500 |
| Jan 27, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTE: OBSERVED AT EXPOSURE #1(EAST ELEV.) RUSTED/LOOSE PART OF FACADE CORNICE AT RIGHT SIDE ALSO CRACKED/SPALLING FACADE STUCCO AT 1ST FLOOR. REMEDY: REPAI #35689666R | Sep 14, 2026 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Oct 27, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO RUSTED/LOOSE PART OF FACADE CORNICE @ RIGHT SIDE & CRACKED/SPALLING STUCCO @ 1ST FLR @ EXP 1 (E.ELEV).REMDY: IMMEDLY TAKE & PROVIDE SAFETY MEASURES TO SECURE & PROTECT THE PUBLIC & INSTALL PUBLIC PROTECTION AT EXP1 (E.ELEV).MAKE IMMEDLY REPAIR UNDER SUPERVISION OF LP. ALS #FA0401AE | DOB VIOLATION - ACTIVE |
| Jan 27, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BLDG. ON AN OCCUPIED 6 STORY MASONARY STRUCTURE DAMAGE IS OBSERVED, TO THE ROOF STRUCT. & ROOF MEMBRANE APPROX 3"-6" IN DIAMETER IN MULTI. AREA POSSIBLE CAUSED BY SOILD ICE FALLING FROM SOLID ICE FALLING FROM THE NEIGHBORING 45 STORY BLDG @ 140 W 24 ST.MN REMDY: RETAIN A NYS RDP #FA0402MK | DOB VIOLATION - ACTIVE |
| Jan 27, 2025 | CONSTRUCTION EWO DUE TO RUSTED/LOOSE PART OF FACADE CORNICE AT RIGHT SIDE ALSO CRAC -KED/SPALLING STUCCO @ 1ST FLR AT EXP 1 E.ELEV. REMEDY: IMMEDIATELY TAKE/PROVIDE SAFETY MEASURE TO SECURE/PROTECT THE PUBLIC AND INSTALL PUBLIC PROTECTION AT EXP 1 E.ELEV. MAKE IMMEDIATE REPAIRS UNDER SUPERV PF LICENSED PROFESSIO #FA0401AE | DOB VIOLATION - ACTIVE |
| Feb 6, 2024 | IMMEDIATE EMERGENCY REMEDY: PROVIDE 60 LINEAR FEET SIDEWALK SHED ALONG THE EXPOSURE#1, NORTH ELEVATION (WEST 24 STREET) #18984 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08892 | DOB VIOLATION - ACTIVE |
| Oct 1, 2005 | LOCAL LAW 10/81 - ELEVATOR #00778 | DOB VIOLATION - ACTIVE |
| Apr 21, 2004 | LOCAL LAW 10/81 - ELEVATOR #00539 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 24, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 1, 2005 | Elevators LL1081 | Active |
| Apr 21, 2004 | Elevators LL1081 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION OBSERVED AT EXP 2 COURTYARD SOUTH ELEVATION, BROKEN WINDOW SILLS AT 2ND FLOOR LEVEL, ALSO OBSERVED MISSING MORTARS AT JOINTS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 1:45 AM ET. BBL 1007990060.