3 floors · 3 apartments · 4,750 sq ft · built 2025 · class C0 · owner of record: Lin, Xing
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 23, 2025 | Construction CLASS - 2 OBSERVED APPROVED PLANS PROVIDED ON SITE IS NON-CONFORMING WHERE NEW STEEL BEAM WAS INSTALLED ABOVE TWO DOORS & 1 WINDOW OPENING, NEW BOLTED ANGLE STEEL TO FOUNDATION AT FRONT & REAR OF 1ST FLOOR FLOOR AREA (CE #39171404X | Jan 8, 2027 | $1,250 |
| Dec 23, 2025 | Unknown CLASS - 1 OBSERVED ON ACTIVE JOB SITE A PLATFORM WAS BUILT IN THE REAR EXTERIOR STAIRS OPENING & EXTERIOR WINDOW WELL OUT OF WOODEN PLANKS, SCAFFOLDING & CMU BLOCKS. UPON REQUEST FOR THE DESIGN/APPROVED DRAWING NON WAS P #39171408N | Jan 8, 2027 | $5,000 |
| Dec 23, 2025 | Construction CLASS - 1 OBSERVED MISSING GUARD RAILS AT THE REAR EXTERIOR CELLAR STAIRS OPENING AREA(NON-STEP SIDE), EXTERIOR WINDOW WELL & ATTIC STAIRS OPENING. NO OTHER SAFETY MEASURE WAS IN PLACE. STOP ALL WORK AT EXTERIOR & ATTIC #39171407L | Jan 8, 2027 | $5,000 |
| Dec 23, 2025 | Unknown CLASS - 2 OBSERVED YODOK PLACED & STORED ON THE ROADWAY OF 137 ST SIDE OF THE SITE, ROADWAY AREA IS BEING USED FOR SITE PARKING/STORAGE, YODOK IS NOT INTERLOCK OR FILLED WITH WATER OR SAND & NO HIGH VISIBILITY MARKING. U #39171405H | Jan 8, 2027 | $2,500 |