14 floors · 68 apartments · 76,795 sq ft · built 1989 · class RM · owner of record: Wisteria Tower Condominium
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 76,795 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5134). Agency page | Dec 31, 2034 in 2991 days | Next due 2034 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $1,212,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SWARMP (2026-10-04) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 15, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING FACADE WALLS AND APPURTENANCES.NOTE:AT THE TIME OF INSPECTION I OBSERVED AT EX#3 NORTH ELEVATION SPALLING AND CRACKED BRICK AT MULTIPLE LOCATIONS.SPALLING AND CRACKED COPING STORE A #35717986L | Feb 24, 2026 IN VIOLATION | $5,000 |
| Dec 9, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 8A & 9A REPORT OF CRITICALEXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES RE QUIRED BY 28-302.4 FOR CONTROL #911383 AGG1:PRIOR NOV 37021272R UNDER #37025189Y | Aug 21, 2023 IN VIOLATION | $3,125 |
| Apr 1, 2021 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#811383.AGG1:PRIOR NOV 37011288M UNDER 2 #37021272R | Jan 18, 2022 DEFAULT | $10,000 |
| May 18, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQUIRED BY 28302.4 FOR CONTROL #811383.REM:SUBMIT REQUIRED TECHNICAL REPORT #37011288M | May 21, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 16, 2023 | CONSTRUCTION APPROXIMATELY 20 LINEAR FOOT OF SECOND STORY ROOF TOP PARKING'S PARAPET WALL HAS BEEN DISPLACED TO ADJACENT GROUND LEVEL REAR PARKING LOT DUE TO VEHICLE IMPACT. #23-01029 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01357 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01454 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | ELEVATOR #12238 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | ELEVATOR VIO ISSUED TO ELEVATOR- FAIL TO CORRECT DEFECTS ON 2016 CAT1 INSP/TST #ACC112238 | DOB VIOLATION - ACTIVE |
| Jan 26, 2017 | ELEVATOR #12338 | DOB VIOLATION - ACTIVE |
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02977 | DOB VIOLATION - ACTIVE |
| Jan 1, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02695 | DOB VIOLATION - ACTIVE |
| Oct 19, 2000 | ELEVATOR #4P5580 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators E | Active |
| May 30, 2014 | Elevators ACC1 | Active |
| May 30, 2014 | Elevators ACC1 | Active |
| May 3, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jan 1, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 5, 2025 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Feb 8, 2026 |
| Nov 5, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR INCORRECT FRAME | Feb 8, 2026 |
| Nov 3, 2025 | B | Apt 10E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE ENTRANCE LOCATED AT APT 10E, 10th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 8, 2025 |
| Oct 31, 2025 | B | Apt 10E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 10E, 10th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 5, 2025 |
| Jul 22, 2013 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER ENTIRE GARAGE CEILING | Aug 26, 2013 |
| Jun 17, 2013 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT GARAGE, 1st STORY | Jul 22, 2013 |