6 floors · 30 apartments · 25,602 sq ft · built 1915 · class C1 · owner of record: 1358 S Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 46 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 25,602 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-01 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 20, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #911576 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01386 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2002016 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #01070 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF44735 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 20, 2024 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Aug 30, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 26, 2026 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 21, 2026 |
| Oct 26, 2026 | B | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK AND AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 30, 2026 |
| Oct 26, 2026 | C | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQFT AT NORTH WALL, EAST WALL, SOUTH WALL, AND AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 21, 2026 |
| Oct 26, 2026 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 21, 2026 |
| Oct 21, 2026 | B | Apt 1E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH WINDOW GLASS PANE AT THE 1ST WINDOW FROM NORTH AT EAST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 25, 2026 |
| Oct 21, 2026 | A | Apt 1E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Oct 21, 2026 | A | Apt 1E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH AT THE EAST WALL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Oct 21, 2026 | A | Apt 1E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Oct 21, 2026 | A | Apt 1E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jan 24, 2027 |
| Oct 21, 2026 | B | Apt 1E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH WINDOW GLASS PANE AT THE 1ST WINDOW FROM NORTH AT EAST IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 25, 2026 |
| Oct 21, 2026 | C | Apt 1E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 16, 2026 |
| Oct 21, 2026 | C | Apt 1E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 16, 2026 |
| Apr 21, 2025 | B | Apt 5C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 5C, 4th STORY, 7th APARTMENT FROM NORTH AT EAST | May 26, 2025 |
| Apr 21, 2025 | B | Apt 5C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 5C, 4th STORY, 7th APARTMENT FROM NORTH AT EAST | May 26, 2025 |
| Feb 7, 2025 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEAVY DUTY MORTISE LOCK AND ASSEMBLY AT BUILDING ENTRANCE DOOR [FROM STREET TO PUBLIC HALL] AT CELLAR | Feb 13, 2025 |
| Aug 29, 2024 | B | Apt 1B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 3, 2024 |
| Aug 6, 2024 | B | Apt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 16791021 ISSUED 02-APR-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a( | Sep 10, 2024 |
| Apr 7, 2021 | A | Apt 3C · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING BASEBOARD RADIATOR COVER , IN THE 4th ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 11, 2021 |
| Apr 7, 2021 | B | Apt 3C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 12, 2021 |
| Apr 7, 2021 | B | Apt 3C · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | May 12, 2021 |
| Apr 7, 2021 | A | Apt 3C · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WALL HUNG WASH BASIN IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 11, 2021 |
| Apr 12, 2012 | B | Apt 3C · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | May 17, 2012 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 26, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK AND AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD C | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQFT AT NORTH WALL, EAST WALL, SOUTH WALL, AND AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 26, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 21, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH WINDOW GLASS PANE AT THE 1ST WINDOW FROM NORTH AT EAST IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH AT THE EAST WALL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER SASH WINDOW GLASS PANE AT THE 1ST WINDOW FROM NORTH AT EAST IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Oct 21, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 11:58 AM ET. BBL 2028300025.