3 floors · 10 apartments · 3,520 sq ft · built 1920 · class C1 · owner of record: 1358 Clay Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 61 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 28, 2025 | Unknown CLASS - 2 UNLAWFUL ACTS, FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER. ASNOTED: A REVIEW OF OUR RECORDS AND PROPERTY FILINGS REVEALED THAT THE PROPERTY OWNER HAS FAILED TO COMPLY WITH A DOB COMMISIONER'S ORDER ISS #35717602N | Nov 7, 2025 DEFAULT | $10,000 |
| Issued | Violation | Status |
|---|---|---|
| Aug 28, 2025 | CONSTRUCTION UNLAWFUL ACT. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER ISSUED 5/15/25, OWNER ORDERED TO RETAIN LIC STRUCTURAL ENG & FILE FOR PERMITS FOR STABILIZATION OF ROCK OUT CROPPING AT REAR OF PROPERTY REMEDY: IMMED COMPLY WITH DOB COMMISSIONER ORDER. FILE CONSTRUCTION REPAIR & STABILIZATION DRAWIN #35717602N | DOB VIOLATION - ACTIVE |
| May 15, 2025 | CONSTRUCTION UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #013120CRW0403BH ISSUED ON 1/31/20. UP TO TODAY'S DATE, NO PERMITS OBTAINED TO STABILIZE THE COMPROMISED ROCK OUT CROPPING AT THE REAR OF PROPERTY. REMEDY:IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #0131020CRW0403BH ISSUED ON JANUARY 31, 2 #RW20403BH | DOB VIOLATION - ACTIVE |
| Jan 31, 2020 | CONSTRUCTION FAILURE TO MAINTAIN/REQUEST ADDITIONAL INFORMATION. REMEDY:OWNER IS DIRECTED TO RETAIN A LIC GEOTECHNICAL ENGINEER TO EVALUATE THE SLOPE STABILITY OF THE ROCK OUTCROPPING AT REAR OF PROPERTY AND PROVIDE A GEOTECHNICAL ENGINEER #RW0403BH | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 29, 2026 | C | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 4, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 12:45 AM ET. BBL 2028870024.