4 floors · 4 apartments · 2,640 sq ft · built 1860 · class C5 · owner of record: Bk 135 St James Place Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-10-29 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 27, 1999 | Construction Non-Hazardous WORK WITHOUT A PERMIT. WORK NOTED: MAJOR ALTERATIONS THRU-OUT ENTIRE BUILDING. CREATING NEW BATHROOM AND KITCHENS TO CREATE TEN (10) DWELL-ING UNITS. REMEDY: FILE ALL NECESSARY PLANS AND OBTAIN PERMITS AND #34210381J | Jun 14, 1999 WRITTEN OFF | $0 |
| Sep 20, 1995 | Construction Non-Hazardous FAILURE TO MAINTAIN:NO VENTILATION IN 5 BATHROOMS + KITCHEENS FROM BASEMENT TO 4TH FLOOR FRONT.REMEDY:OBTAIN PERMIT-MAKE NECESSARY REPAIRS. #34131581Z | Jan 22, 1996 WRITTEN OFF | $0 |
| May 16, 1990 | Construction Non-Hazardous WORK WITHOUT A PERMIT. MAJOR ALTERATIONS THROUGHOUT ENTIRE BUILDING. STOP WORK ORDER PREVIOUSLY ISSUED DISREGARDED AND COMPLETED JOB. REMEDY: FILE NECESSARY PLANS AND OBTAIN #34040949Y | Sep 10, 1990 WRITTEN OFF | $0 |
| May 16, 1990 | Construction Non-Hazardous FAILURE TO MAINTAIN. NO VENTILATION IN 5 BATHROOM AND 5 KTICHENS FROM BASEMENT TO 4TH FLOOR FRONT. REMEDY: OBTAIN A PERMIT AND MAKE NECESSARY REPAIRS FORTHWITH. #34040950L | Sep 10, 1990 WRITTEN OFF | $0 |
| Dec 19, 1988 | Construction Unknown WORK WITHOUT A PERMIT. CREATING A NEW BATHROOM AND KITCHEN IN AREAS IN ALL APARTMENTS REPLACING SHEETROCK THROUGHOUT PUBLIC HALL. #34017758X | Feb 6, 1989 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #10321 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09265 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #36043 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #19479 | DOB VIOLATION - ACTIVE |
| Sep 26, 2007 | LANDMARK #08-0187 | DOB VIOLATION - ACTIVE |
| Nov 28, 2000 | LANDMARK #01-0299 | DOB VIOLATION - ACTIVE |
| Apr 27, 1999 | CONSTRUCTION WORK WITHOUT A PERMIT. WORK NOTED: MAJOR ALTERATIONS THRU-OUT ENTIRE BUILDING. CREATING NEW BATHROOM AND KITCHENS TO CREATE TEN DWELLING UNITS REMEDY: FILE ALL NECESSSARY PLANS AND OBTAIN PERMITS AND APPROVALS IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION #02HS03 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #39283 | DOB VIOLATION - ACTIVE |
| Apr 1, 1993 | CONSTRUCTION #02A06 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| May 28, 1992 | CONSTRUCTION #02A03VW | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 30, 1992 | CONSTRUCTION #02H1 | DOB VIOLATION - ACTIVE |
| May 16, 1990 | CONSTRUCTION #02F2 | DOB VIOLATION - ACTIVE |
| May 16, 1990 | CONSTRUCTION #02F3 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 5, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 8, 2026 |
| Jun 10, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 13, 2025 |
| Apr 30, 2025 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FRONT YARD | Jun 4, 2025 |
| Apr 11, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 15, 2024 |
| Mar 24, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 27, 2023 |
| Oct 4, 2022 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE BUILDING FRONT ENTRANCE COURT | Nov 8, 2022 |
| Mar 2, 2022 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jun 5, 2022 |
| Apr 13, 2021 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 17, 2021 |
| Feb 1, 2019 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | May 7, 2019 |
| Jun 23, 2017 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Sep 26, 2017 |
| Jun 23, 2017 | A | Apt 3F · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ''B'' ROOMS CONVERTED TO CLASS ''A'' APT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 26, 2017 |
| Jun 23, 2017 | B | Apt 3F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT EAST/NORTH 1 ROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jul 28, 2017 |
| Oct 27, 2016 | A | Apt GF · SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT GF, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 30, 2017 |
| Sep 6, 2016 | C | Apt 3F · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, APARTMENT AT NORTH | Sep 1, 2016 |
| Sep 2, 2016 | C | SECTION 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM : DOOR TO CELLAR LOCKED AT 1 STY PUBLIC HALL | Sep 10, 2016 |
| Apr 12, 2016 | C | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER CEILING AT CELLAR | Apr 20, 2016 |
| Apr 8, 2016 | B | SECTION 27-2050 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM. AT PUBLIC HALL, 4th STORY | May 13, 2016 |
| Oct 26, 2009 | C | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AND MISSING FIRE RETARDENT PLASTER CEILING AT CELLAR | Nov 1, 2009 |
| Sep 24, 2009 | B | Apt 1F · SECTION 27-2005 ADM CODE PROVIDE FRESH AIR VENT BATHROOM 1 STY APT 1F. LOCATED AT APT 1F | Oct 29, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 2:43 PM ET. BBL 3019640008.