4 floors · 12 apartments · 10,347 sq ft · built 2023 · class C1 · owner of record: 135 Mcdonald Equity Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 3, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION, I OBSERVED SIDEWALK SHED REMOVED, FRAMING TO THE 5&6 FLOOR COMPLETED/SHEET ROCK, FACADE COMPLETED, UPON REVIEW OF THE DEPARTMENT RECORD IT REVEAL THAT THERE IS A FULL STOP WORK ORD #39554966X | Mar 29, 2027 | $10,000 |
| May 15, 2026 | Construction CLASS - 1 ATOI, I OBSERVED THAT WORK WAS CONTINUED WHILE NOTICED OF FSWO EXISTS ON THIS PROPERTY SINCE 04/30/26, COMP. #3A59800, INDICATING STOP ALL WORK ENTIRE JOBSITE. COMPARING PREVIOUS PHOTOS, I FOUND THAT ON 4FL, 5F #39554209Z | Feb 16, 2027 | $10,000 |
| Apr 30, 2026 | Construction CLASS - 1 AT HE TIME OF MY INSPECTION OF A 5 STORY BUILDING, I OBSERVED ACTIVE JOBSITE WITH ALL TRADES, UPON REVIEW OF THE DEPARTMENT RECORD IT REVEAL THAT THERE IN A PARTIAL STOP WORK ORDER TO STOP ALL WORK ABOVE THE 4T #39553679Z | Jan 29, 2027 | $10,000 |
| Apr 15, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION, I OBSERVED WORKERS ON THE 5 FLOOR INSTALLING CMU, FLOOR JOIST AND WELDING " I " BEAM WITH THE FLOORING JOIST NOT COVER, INADEQUATE GUARD RAILS, PPE, ANCHORAGE POINT NOT INSTALLED. #39553045R | Jan 22, 2027 | $5,000 |
| Apr 15, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION, I OBSERVED WORKERS ON THE 5 FLOOR INSTALLING CMU AND WELDING " I " BEAM. UPON REQUEST FOR WELDERS LICENSE, NONE WAS PRESENTED OR AT JOBSITE. FAILURE TO PROVIDE AND MAINTAIN WELDERS #39553046Z | Jan 22, 2027 | $2,500 |
| Mar 26, 2026 | Construction CLASS - 1 BC 3309.10-AT THE TIME OF MY INSPECTION OF A PROPOSED 5-STORY NEW BUILDING AT 4TH FLOOR LEVEL, I OBSERVED WORKERS ON TOP FLOOR INSTALLING CMU BLOCKS, STEEL HOISTING & INSTALLATION WITH NO ROOF PROTECTION PROVID #39552241J | Feb 9, 2027 | $2,500 |
| Mar 26, 2026 | Unknown CLASS - 1 BC 3314.1-AT THE TIME OF INSPECTION OF A PROPOSED 5-STORY NEW BUILDING, I OBSERVED WORKERS PLACING CMU ON AN INADEQUATELY INSTALLED PIPE SCAFFOLD AT CORNER OF EXPOSURE 2&3. TOP FLOOR. NO GUARDRAILS, INADEQUATEL #39552239K | Feb 9, 2027 | $5,000 |
| Mar 26, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OF A PROPOSED 5-STORY NEW BUILDING, I OBSERVED A LARGE AMOUNT OF CONSTRUCTION DEBRIS, PROTRUDING NAILS, GARBAGE AND COMBUSTIBLE MATERIALS AT REAR YARD APPROXIMATELY 6 FEET IN HEIGHT. F #39552238Z | Feb 9, 2027 | $2,500 |
| Mar 26, 2026 | Construction CLASS - 1 28-120.1-AT THE TIME OF MY INSPECTION OF AN OCCUPIED BUILDING, I OBSERVED CONSTRUCTION WORK ADDITION OF 2 MORE FLOORS WAS IN PROGRESS WHILE THE TENANT PROTECTION PLAN (TPP) HAS NOT BEEN APPROVED BY THE DEPARTME #39552240H | Feb 9, 2027 | $2,500 |
| Mar 26, 2026 | Unknown CLASS - 1 AT THE TIME OF MY INSPECTION OF A PROPOSED 5-STORY NEW BUILDING, I OBSERVED WORKERS ON TOP FLOOR INSTALLING CMU BLOCKS, STEEL HOISTING & INSTALLATION WITH NO OVERHEAD PROTECTION FOR ADJOINING PROPERTY AT EXPOSU #39552237R | Feb 9, 2027 | $10,000 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)