class V1 · owner of record: Bw 38 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 10, 2026 | Construction CLASS - 2 GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039556566X-ISSUED 7.14.2026 .. #39559018Z | Nov 17, 2026 PENDING | $1,250 |
| Jul 31, 2026 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS. AS NOTED AT THE TIME OF INSPECTION OF A PROPOSED 6 STORY NEW BUILDING ACTIVE JOBSITE WORK IN PROGRESS, DOING FORM WORK STRIPPING OPERA #35730877Z | Oct 13, 2026 DEFAULT | $1,280 |
| Jul 31, 2026 | Unknown CLASS - 1 FAILURE TO PROVIDE PROTECTION OF ADJOINING PROPERTY DURING CONSTRUCTION OR DEMOLITION AS REQUIRED-NO ROOF PROTECTION. AS NOTED AT THE TIME OF INSPECTION OF A PROPOSED 6-STORY NEW BUILDING ACTIVE JOBSITE, DOING #35730876R | Oct 13, 2026 DEFAULT | $5,030 |
| Jul 14, 2026 | Unknown CLASS - 1 ACTIVE 6STORY NB CURRENTLY AT 2ND FLR LEVEL. OBSERVED NO FIRE EXTINGUISHERS WERE BEING MAINTAINED ON SITE IN CASE OF EMERGENCY/FIRE. DID NOT OBSERVE FIRE EXTINGUISHERS ANYWHERE ON SITE. CP WAS UNABLE TO POINT O #39556566X | Sep 22, 2026 DEFAULT | $1,280 |
| Jul 14, 2026 | Construction CLASS - 2 ACTIVE PROPOSED 6STORY NB CURRENTLY AT 2ND FLR LEVEL. OBSERVED INADEQUATE HOUSEKEEPING ON SITE. EXCESSIVE GARBAGE AND COMBUSTIBLE CONSTRUCTION DEBRIS STORAGE ON FIRST FLOOR AT EXPO1 PILED HIGH. CREATES POSSIBLE #39556565Y | Sep 22, 2026 DEFAULT | $1,280 |
| Jul 6, 2026 | Unknown CLASS - 1 OBSERVED NO ROOF PROTECTION FOR ADJACENT PROPERTY ON EXP #2, #4. MISSING ROOF PROTECTION MEANS UNNECESSARY RISK FOR DAMAGING ADJACENT PROPERTY. STOP ALL EXTERIOR WORK ON EXP #2, #4 AND STAY 10FT BACK ABOVE BASE #39556235L | Mar 16, 2027 PENDING | $10,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 10, 2026 | ECB | Construction: GENERAL CONTRACTOR FAILED TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 039556566X-ISSUED 7.14.2026 .. | Open |
| Jul 31, 2026 | ECB | Construction: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS. AS NOTED AT THE TIME OF INSPECTION OF A PROPOSED 6 STORY NEW BUILDING ACTIVE JOBSITE WORK IN PROGRESS, DOING FORM WORK STRIPPING OPERA | Open |
| Jul 31, 2026 | ECB | Unknown: FAILURE TO PROVIDE PROTECTION OF ADJOINING PROPERTY DURING CONSTRUCTION OR DEMOLITION AS REQUIRED-NO ROOF PROTECTION. AS NOTED AT THE TIME OF INSPECTION OF A PROPOSED 6-STORY NEW BUILDING ACTIVE JOBSITE, DOING | Open |
| Jul 14, 2026 | ECB | Unknown: ACTIVE 6STORY NB CURRENTLY AT 2ND FLR LEVEL. OBSERVED NO FIRE EXTINGUISHERS WERE BEING MAINTAINED ON SITE IN CASE OF EMERGENCY/FIRE. DID NOT OBSERVE FIRE EXTINGUISHERS ANYWHERE ON SITE. CP WAS UNABLE TO POINT O | Open |
| Jul 14, 2026 | ECB | Construction: ACTIVE PROPOSED 6STORY NB CURRENTLY AT 2ND FLR LEVEL. OBSERVED INADEQUATE HOUSEKEEPING ON SITE. EXCESSIVE GARBAGE AND COMBUSTIBLE CONSTRUCTION DEBRIS STORAGE ON FIRST FLOOR AT EXPO1 PILED HIGH. CREATES POSSIBLE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 9, 2026, 2:43 PM ET. BBL 4049740045.