5 floors · 9 apartments · 8,325 sq ft · built 1920 · class C7 · owner of record: Haf Edgecombe Assoclp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 19, 2026 | C | Apt 5R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCES AT LOWER WINDOW SASH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 25, 2026 |
| Oct 19, 2026 | C | Apt 5R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 25, 2026 |
| Oct 19, 2026 | B | Apt 5R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCES AT LOWER SASH AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 23, 2026 |
| Oct 19, 2026 | C | Apt 5R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASEBOARD HEATER COVER AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 25, 2026 |
| Sep 9, 2026 | A | Apt 2L · § 27-2026 ADM CODE REPLACE WITH NEW THE DEFECTIVE FLUSH PIPE OF WATER CLOSET IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 13, 2026 |
| Aug 24, 2026 | C | Apt 2L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 19, 2026 |
| Aug 24, 2026 | C | Apt 2L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 19, 2026 |
| Sep 12, 2025 | C | Apt 2L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 18, 2025 |
| Sep 12, 2025 | C | Apt 2L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 8, 2025 |
| Sep 12, 2025 | B | Apt 2L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 17, 2025 |
| Sep 12, 2025 | C | Apt 2L · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARDWOOD FLOORS IN THE PRIVATE HALLWAY LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 18, 2025 |
| Apr 10, 2025 | B | Apt 2L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 15, 2025 |
| Mar 17, 2025 | A | Apt 2L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 20, 2025 |
| Feb 24, 2025 | C | Apt 2L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 2, 2025 |
| Feb 24, 2025 | C | Apt 2L · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 23, 2025 |
| Jan 21, 2025 | C | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HANDRAIL ON SOUTH WALL AT PUBLIC HALL STAIRS, 1st STORY | Jan 27, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 19, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCES AT LOWER WINDOW SASH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 19, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH AT EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 19, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCES AT LOWER SASH AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Oct 19, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASEBOARD HEATER COVER AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 9, 2026 | HPD A | § 27-2026 ADM CODE REPLACE WITH NEW THE DEFECTIVE FLUSH PIPE OF WATER CLOSET IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 24, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 24, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 9:30 AM ET. BBL 1020430004.