Queens · Block 5123 · Lot 4 · 11355

134-14 Franklin Avenue

6 floors · 93 apartments · 89,367 sq ft · built 1920 · class D1 · owner of record: E E H Realty Corp

161open violations
$8,045ECB/OATH penalties owed
83HPD class C (immediately hazardous)
50dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 89,367 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1146 days
Next cycle year 2029
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5123). Agency page

Dec 31, 2033
in 2607 days
Next due 2033
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-06 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $8,045 owed
IssuedViolationHearingBalance
Jun 3, 2020Elevators CLASS - 1
NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM A
#39023401X
Dec 15, 2020
DEFAULT
$6,250
Mar 6, 2020Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER. AT THE TIME OF INSPECTION, AT ROOF LEVEL ABOVE APARTMENT 6B AND 6C. BULK HEAD DOOR IS DETACHED WITH METAL FRAME. ALLOWING ANYONE TO EXIT AT ROOF LEVEL AND
#39019125R
Dec 29, 2020
DEFAULT
$1,795
Jul 18, 2008Elevators CLASS - 3
98BB05.100BB05. 100 2YR TEST
#38188558N
Sep 9, 2008
DEFAULT
$0
Mar 22, 2007Elevators Non-Hazardous
S.O.66Z02,51B10,51A10,84B06,39P07,51B07,24I10.51B10-RESHACKLE CWT'S SIDE DUE TO WRONG BABBITING.51A10-PROVIDE SPRINGS ON CAR SIDE,84B06- STEADYING PLATES,51B07-SPIN OUT.
#38165289M
May 8, 2007
DEFAULT
$0
DOB (12)
IssuedViolationStatus
Sep 2, 2020FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#06265
DOB VIOLATION - ACTIVE
Jun 11, 2019CONSTRUCTION
FTM:DUE TO A 3 ALARM FIRE OCCURRED ON 6/8/19 AT ROOF OF THE PREMISES, APPROX 20'WX40'WAS FIRE DMGED LINES C&B OF APTS.6B&6C EXTENSIVE WTR DMG WITH JOIST&WALLS EXPOSED.BELOW 6FL B&C LINES OF APTS PRESENTED WTR DMG. OWNER ENGAGE PE&ENDORSED CONTRCT TO EVAL WHOLE BLDG&OBTAIN PRMTS FOR REPAIRS N/L/THAN
#FEU40702FF
DOB VIOLATION - ACTIVE
Jun 11, 2019CONSTRUCTION
EMERG WRK:DUE TO 3 ALARM FIRE OCCURED ON 6/8/19 ROOF ABOVE LINES C&B FIRE DMG.ROOF DECKING SEVERE BURNT&STRUCT DMG,JOIST MODERATE DMG.APTS 6B&6C EXTENSIV WTR DMG WITH JOIST&WALLS EXPOSED.B&C LINES APT WTR DMG OWN ENGAGE PE&ENDORSED CONTRCT TO REPR DMG ROOF.WRK TO BE UNDER CONTIN SUPV OF PE.FILE REPR
#FEU40701FF
DOB VIOLATION - ACTIVE
Jun 8, 2019CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. AT THE TIME OF INSPECTION, DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO THE ROOF AND APARTMENTS 6B AND 6C DUE TO A FIRE AT 134-14 FRANKLIN AVENUE.
#19-00444
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#06448
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#06679
DOB VIOLATION - ACTIVE
Mar 3, 2008ELEVATOR

#2362H226918
DOB VIOLATION - ACTIVE
Aug 20, 2007ELEVATOR

#2203H226662
DOB VIOLATION - ACTIVE
Aug 20, 2007ELEVATOR

#2203H226666
DOB VIOLATION - ACTIVE
Aug 20, 2007ELEVATOR

#2203H226665
DOB VIOLATION - ACTIVE
Aug 20, 2007ELEVATOR

#2203H226664
DOB VIOLATION - ACTIVE
Aug 20, 2007ELEVATOR

#2203H226663
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Sep 2, 2020AEUHAZ FTC-AEU-HAZ
Active
Jan 26, 2018Elevators ACC1
Active
Jan 3, 2017Elevators ACC1
Active
HPD (142) · C 83 · B 45 · A 14
IssuedClassViolationCorrect by
Jul 6, 2026A§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES ALL STORIES AT NORTH STACK BUILDING FRONT AT FIRE ESCAPEOct 9, 2026
Apr 12, 2024CApt 6R · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHApr 18, 2024
Feb 29, 2024CApt 6R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMar 26, 2024
Feb 9, 2024CApt 5E · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT EASTFeb 8, 2024
Feb 1, 2024BApt 6R · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES NO GAS SUPPLY AT RANGE (TENANT IS RESPONSIBLE FOR GAS BILL) IN THE KITCHEN LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMar 7, 2024
Dec 19, 2023BApt 6R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10 SQFT AT THE NORTH WALL IN THE BATHROOM LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJan 23, 2024
Dec 19, 2023AApt 6R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM NORTH AT WEST, THE BATHROOM , THE FOYER , THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMar 23, 2024
Dec 19, 2023CApt 6R · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES NO GAS AT RANGE IN THE KITCHEN LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHDec 25, 2023
Dec 19, 2023AApt 6R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , CEILING, WEST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMar 23, 2024
Dec 19, 2023BApt 6R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 12 SQ FT AT THE WEST AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJan 23, 2024
Nov 16, 2023AApt 6R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, WEST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTHFeb 19, 2024
Aug 14, 2023C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Aug 18, 2023
Aug 14, 2023C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Aug 18, 2023
Feb 10, 2023AApt 1C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1C, 1st STORY, 4th APARTMENT FROM WEST AT NORTHMay 16, 2023
Sep 1, 2022AApt 5R · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL AT APARTMENT ENTRANCE DOOR LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHDec 5, 2022
Aug 29, 2022BApt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHNov 2, 2022
Aug 29, 2022BApt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHNov 2, 2022
Aug 29, 2022BApt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHNov 2, 2022
Aug 29, 2022CApt 5R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHSep 24, 2022
Aug 29, 2022BApt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHNov 2, 2022
Aug 29, 2022BApt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHNov 2, 2022
Nov 30, 2021BApt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHJan 4, 2022
Nov 30, 2021AApt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHMar 5, 2022
Nov 30, 2021AApt 5R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUB FLOOR IN THE KITCHEN LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHMar 5, 2022
Nov 30, 2021BApt 5R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE FOYER LOCATED AT APT 5R, 5th STORY, 1st APARTMENT FROM WEST AT NORTHJan 4, 2022
Nov 16, 2021BApt 2S · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2S, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST''Dec 21, 2021
Nov 16, 2021CApt 2S · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2S, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST''Dec 12, 2021
Feb 9, 2021CApt 6E · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHFeb 13, 2021
Jan 20, 2021CApt 3C · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3C, 3rd STORY, 7th APARTMENT FROM WEST AT NORTHFeb 13, 2021
Jan 19, 2021BApt 5T · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL, EAST WALL, NORTH WALL, CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 5T, 5th STORY, 3rd APARTMENT FROM WEST AT NORTHFeb 23, 2021
Jan 19, 2021CApt 6I · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6I, 6th STORY, 5th APARTMENT FROM NORTH AT EASTJan 23, 2021
Jan 19, 2021CApt 6K · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 5th APARTMENT FROM NORTH AT EASTJan 23, 2021
Jan 19, 2021CApt 6S · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6S, 6th STORY, 2nd APARTMENT FROM SOUTH AT WESTJan 23, 2021
Jan 19, 2021CApt 5T · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 2nd DOOR FROM EAST AT SOUTH WALL, 2nd DOOR FRAME FROM EAST AT SOUTH WALL IN THE 3rd ROFeb 12, 2021
Jan 19, 2021CApt 6F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM NORTH AT EASTJan 23, 2021
Jan 19, 2021CApt 6G · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTJan 23, 2021
Jan 19, 2021CApt 5T · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 5T, 5th STORY, 3rd APARTMENT FROM WEST AT NORTHJan 23, 2021
Jan 19, 2021CApt 4T · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4T, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''Jan 23, 2021
Jan 19, 2021CApt 6C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 6th APARTMENT FROM SOUTH AT WESTJan 23, 2021
Jan 19, 2021CApt 6A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6A, 6th STORY, 4th APARTMENT FROM SOUTH AT WESTJan 23, 2021
Jan 19, 2021CApt 5L · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 5L, 5th STORY, 6th APARTMENT FROM NORTH AT EASTJan 23, 2021
Jan 19, 2021CApt 4S · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4S, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTJan 23, 2021
Jan 19, 2021CApt 4K · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4K, 4th STORY, 5th APARTMENT FROM NORTH AT EASTJan 23, 2021
Jan 19, 2021BApt 5T · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5T, 5th STORY, 3rd APARTMENT FROM WEST AT NORTHFeb 23, 2021
Dec 21, 2020CApt 4A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHJan 16, 2021
Dec 21, 2020CApt 4A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHJan 16, 2021
Dec 15, 2020CApt 6R · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTDec 19, 2020
Dec 15, 2020C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Dec 19, 2020
Dec 15, 2020CApt 6N · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 6N, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 19, 2020
Dec 15, 2020CApt 1B · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 3rd APARTMENT FROM SOUTH AT WESTDec 19, 2020
Dec 15, 2020CApt 1N · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 1N, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 19, 2020
Dec 15, 2020CApt 1R · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTDec 19, 2020
Dec 15, 2020CApt 2C · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 6th APARTMENT FROM SOUTH AT WESTDec 19, 2020
Dec 15, 2020CApt 2F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTDec 19, 2020
Dec 15, 2020CApt 2L · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 2nd STORY, 6th APARTMENT FROM NORTH AT EASTDec 19, 2020
Dec 15, 2020CApt 3M · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 19, 2020
Dec 15, 2020CApt 3R · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 19, 2020
Dec 15, 2020CApt 4A · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 4th APARTMENT FROM SOUTH AT WESTDec 19, 2020
Dec 15, 2020CApt 4F · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM NORTH AT EASTDec 19, 2020
Dec 15, 2020CApt 5G · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTDec 19, 2020

Showing 60 of 142. Full list on the agency site.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 9:43 AM ET. BBL 4051230004.

Look up another building