1 floors · 2,240 sq ft · built 1940 · class M1 · owner of record: Spirit & Truth Christian Church Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jul 27, 2020 | CONSTRUCTION FTM:BLDG IN STATE OF DISREPAIR DUE TO FIRE DAMAGE AT ROOF ADJACENT TO FRONT WALL.SEVERE CHARING OF THE SPIRE SUPPORT.DAMAGED&LOOSE MATERIAL NOTED AT FRONT WALL.COLLAPSED CEILINGS AND WATER DAMAGEADJACENT TO FRONT WALL.THE EAST WALL IS BOWING OUTWARD.OWNER ENGAGE NYSPE&CONTRACT TO REPAIR BUILDING UND #FEU41003XC | DOB VIOLATION - ACTIVE |
| Jul 23, 2020 | CONSTRUCTION EMERG WORK:BLDG SUST FIRE DMGE 7/22/20.EXP1 SUTTER AVE&EXP4 ON 134 ST ROOF FRAM SUPPT'G THE SPIRE@EXP1 DMGD BY FIRE.SPIRE NOT PROP ANCHOR TO THE ROOF&POTENT OF DETCH FRM BLDG POSING A RISK PUBL.LOOSE ROOF&SIDING OBS.@EXP1 ROOF/WALL.OWNR IMMD INSTL SWSHED@EXP1&4 &REMOVE OR STABILIZE THE SPIRE UNDR DI #FEU41001XC | DOB VIOLATION - ACTIVE |
| Jul 22, 2020 | CONSTRUCTION DAMAGE TO HAVE BEEN SUSTAINED TO STEEPLE OF CHURCH LOCATED AT EXP.#1 SUTTER AVENUE FROM FIRE. PARTITION WALLS AND WINDOWS REMOVED IN ENTRY WAY OF CHURCH DAMAGED FRONT EXP.#1 #CER01GD | DOB VIOLATION - ACTIVE |
| Mar 18, 1997 | CONSTRUCTION #10LE01 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 3:54 PM ET. BBL 4117730093.