Bronx · Block 2931 · Lot 15 · 10456

1332 Fulton Avenue

4 floors · 25,000 sq ft · built 1972 · class I5 · owner of record: Bm 1332 Llc

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
780dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 49 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 780 days
Next cycle year 2028

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Feb 1, 2018Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING. NOTED: AT 4TH FLOOR STAIRCASE A, AND AT 2ND FLR STAIRCASE A, EXIT DOORS NOT SELF-CLOSING OBSERVED. RMDY: REPAIR/REPLACE DOOR.
#35316763R
May 4, 2018
IN VIOLATION
$0
Mar 2, 2017Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING. NOTED: NOT SELF CLOSING DOOR WAS OBSERVED AT 1-4TH FLOOR, STAIRCASE A, AND 2-AT 1ST FLOR STAIRCASE B. RMDY: REPAIR/REPLC DOOR.
#35234807K
Apr 21, 2017
DEFAULT
$0
DOB (0)

None open.

DOB NOW Safety (3)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 12, 2026, 2:59 AM ET. BBL 2029310015.

Look up another building