7 floors · 128 apartments · 185,149 sq ft · built 2006 · class D7 · owner of record: Urban Horizons Ii Housing Development Fu Nd
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2976). Agency page | Dec 31, 2026 in 69 days | Due this year |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $118,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 121 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 185,149 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Annual boiler inspection (8 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 21, 2026 | Elevators CLASS - 2 CLASS 2 ITEMS: (1) HOIST ROPES SHOWING SIGNS OF ROUGE. (2) COUNTERWEIGHT RUNBY LESS THAN 6 INCHES. (3) IN CAR COMMUNICATION INOPERATIVE. (4) CLEAN MACHINE ROOM, TOP OF CAR & ENTIRE PIT AREA. #39174570P | Apr 3, 2026 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 15, 2026 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM THAT IS MISSING AT PUBLIC HALL, 1st STORY | Oct 21, 2026 |
| Oct 15, 2026 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Jan 18, 2027 |
| Oct 15, 2026 | A | § 27-2042 ADM CODE PROVIDE A MIRROR IN SELF-SERVICE ELEVATOR ARRANGED SO AS TO ENABLE A PERSON ENTERING, TO VIEW INSIDE OF ELEVATOR NUMBER ID# 2P10828 | Jan 18, 2027 |
| Oct 15, 2026 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Jan 18, 2027 |
| Sep 25, 2026 | B | Apt 1G · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES INADEQUATE SUPPLY OF WATER PRESSURE (HOT) IN THE KITCHEN LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 30, 2026 |
| Sep 25, 2026 | B | Apt 1G · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES INADEQUATE PRESSURE AT KITCHEN SINK IN THE KITCHEN LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 30, 2026 |
| Sep 24, 2026 | C | Apt 6H · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Sep 23, 2026 |
| Sep 9, 2026 | B | Apt 2C · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LATCHSET AT BEDROOM ENTRANCE DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 14, 2026 |
| Sep 9, 2026 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 5, 2026 |
| Aug 27, 2026 | B | Apt 5A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' ORIGINAL VIOLATION 18823244 ISSUED 27-APR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINIST | Oct 1, 2026 |
| Jul 31, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER CHUTE DOOR AT COMPACTOR CLOSET, 2nd STORY | Aug 14, 2026 |
| Jun 22, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES AT PUBLIC HALL, 2nd STORY, SECTION AT EAST | Jun 28, 2026 |
| May 26, 2026 | B | Apt 2K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 18597848 ISSUED 22-JAN-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017. | Jun 30, 2026 |
| May 6, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE AT PUBLIC HALL, 2nd STORY, SECTION ''SOUTH'' | Jun 10, 2026 |
| Apr 7, 2026 | C | Apt 5I · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5I, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | May 3, 2026 |
| Mar 26, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY | Jun 29, 2026 |
| Mar 26, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY | Apr 30, 2026 |
| Jan 26, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY | May 1, 2026 |
| Feb 3, 2025 | B | Apt 5A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING (ABOVE WINDOW STOOL) IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 5A, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''south'' ORIGINAL VIOLATION 17317846 ISSUED 02-OCT-24 HA | Mar 10, 2025 |
| Jan 18, 2024 | C | Apt 20 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 20, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 13, 2024 |
| Jan 17, 2024 | B | Apt 20 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM THE BUILDING ENTRANCE DOOR TOTHE APARTMENT WALL PANEL IN THE ENTRANCE LOCATED AT APT 20, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST | Feb 21, 2024 |
| Oct 11, 2023 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 6, 2023 |
| Oct 11, 2023 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 6, 2023 |
| Sep 11, 2023 | C | Apt 2O · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2O, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 7, 2023 |
| Sep 11, 2023 | B | Apt 2O · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCE IN THE 1st ROOM FROM EAST LOCATED AT APT 2O, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 16, 2023 |
| Sep 11, 2023 | C | Apt 2O · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2O, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 7, 2023 |
| Apr 10, 2023 | B | Apt 20 · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 20, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2023 |
| Apr 10, 2023 | B | Apt 20 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF VERMIN WATERBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 20, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2023 |
| Apr 10, 2023 | B | Apt 20 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 20, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST | May 15, 2023 |
| Mar 3, 2023 | C | Apt 2O · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2O, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Mar 29, 2023 |
| Mar 3, 2023 | C | Apt 2O · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2O, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH | Mar 29, 2023 |
| Oct 13, 2022 | C | Apt 2O · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2O, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH | Nov 8, 2022 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 15, 2026 | HPD C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM THAT IS MISSING AT PUBLIC HALL, 1st STORY | Open |
| Oct 15, 2026 | HPD A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Open |
| Oct 15, 2026 | HPD A | § 27-2042 ADM CODE PROVIDE A MIRROR IN SELF-SERVICE ELEVATOR ARRANGED SO AS TO ENABLE A PERSON ENTERING, TO VIEW INSIDE OF ELEVATOR NUMBER ID# 2P10828 | Open |
| Oct 15, 2026 | HPD A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Open |
| Sep 25, 2026 | HPD B | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES INADEQUATE SUPPLY OF WATER PRESSURE (HOT) IN THE KITCHEN LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Sep 25, 2026 | HPD B | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES INADEQUATE PRESSURE AT KITCHEN SINK IN THE KITCHEN LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Open |
| Sep 24, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Open |
| Sep 9, 2026 | HPD B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LATCHSET AT BEDROOM ENTRANCE DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Sep 9, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Aug 27, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'' ORIGINAL VIOLATION 18823244 ISSUED 27-APR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINIST | Open |
| Jul 31, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER CHUTE DOOR AT COMPACTOR CLOSET, 2nd STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 3:04 AM ET. BBL 2029760007.