Brooklyn · Block 1949 · Lot 61 · 11238

133 Clifton Place

2 floors · 4 apartments · 3,938 sq ft · built 1935 · class C3 · owner of record: Church Of God Inc

17open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 796 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (4)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
HPD (13) · C 6 · B 6 · A 1
IssuedClassViolationCorrect by
Apr 14, 2026CApt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTHMay 10, 2026
Apr 14, 2026CApt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTHMay 10, 2026
Apr 14, 2026AApt 1 · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTHJul 18, 2026
Apr 14, 2026CApt 1 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT HINGES IN THE 1st ENTRANCE FROM NORTH LOCATED AT BSMT-APT 1, 1st BSMT-APT FROM WEST AT NORTHApr 28, 2026
Oct 7, 2025BApt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 11, 2025
Oct 7, 2025B§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS AT NORTH WALL AT REAR AT CELLARNov 11, 2025
Nov 25, 2015CApt 1 · § 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR .. IN THE ENTRANCE LOCATED AT APT 1 UPPER LEVEL, 1st STORY, APARTMENT AT EASTDec 3, 2015
Nov 20, 2015BApt 1 · § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION NO NEW CERTIFICATE OF OCCUPANCY, COMMERCIAL SPACE NOW RESIDENTIAL LOCATED AT APT 1, 1st STORYDec 25, 2015
Nov 2, 2015CApt 1 · § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK IN THE 1st ROOM FROM NORTH LOCATED AT APT 1 UPPER LEVEL, 1st STORYNov 10, 2015
Nov 2, 2015BSECTION 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED BX ELECTRICAL WIRING AT CEILING TO BUILDING ENTRANCE , 1st STORYDec 7, 2015
Nov 2, 2015CApt 1 · § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1 UPPER LEVEL, 1st STORYNov 10, 2015
Nov 2, 2015BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL SEAL AROUND FLUE PIPE AT CELLARDec 7, 2015
Oct 26, 2015BSECTION 27-2027 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT BUILDING FRONT AT STOOP , 1st STORYNov 30, 2015

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 10:31 AM ET. BBL 3019490061.

Look up another building