2 floors · 22,000 sq ft · built 1931 · class G2 · owner of record: 133-16 35 Ave Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1152 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 14, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB-FTC VIO #051526PI40709SB AND DOB-CONTROL #370493 DATED 05/15/2026. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S O #35733228M | Sep 22, 2026 DEFAULT | $2,530 |
| Jun 30, 2026 | Construction CLASS - 2 PSWO AND ECB VIOLATION ISSUED FOR W W/O PERMIT. OBSERVED AT EXP. 3 METAL/WOODEN FRAMED VERTICAL STRUCTURE APPROX. 120'X120'X8' HIGH. STRUCTURE IS ABOVE 1ST. FLOOR ROOF. WORK 80% COMPLETE., OBTAIN ALL PERMITS #39194359H | Sep 8, 2026 DEFAULT | $6,250 |
| Aug 20, 2018 | Construction CLASS - 2 FAILURE TO SIGN-OFF COMPLETED WORK WITHIN ONE YEAR OF EXPIRATION. APPLICATION #420568718 PERMIT EXPIRED 03/19/2013. REM: PROVIDE LETTER OF COMPLETION. CONTACT SEP UNIT AT 718.286.8370. #35308333R | Oct 9, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 15, 2026 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#348135 VIO#032626PI40701AG DATED 03/26/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/27/26. AS OF 05/15/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348135 &VIO#032626PI40701AG #PI40709SB | DOB VIOLATION - ACTIVE |
| Mar 26, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 MULT STUCCO MASONRY HAIRLINE CRACKS THROUGHOUT THE ENTIRE EXP W/VERT CMU CRACK PRESENT @ ENTRY DOOR OPENING. EXP2 HAS DIAGNOL STEP CRACKS & HORIZONTAL CRACKING ON CMU MASONRY IN VARIOUS LOCATIONS. OWNR TO IMMED RETAIN REG PROF TO EVAL ENTIE BLDG & SUBMIT A C #PI40701AG | DOB VIOLATION - ACTIVE |
| Feb 25, 2020 | CONSTRUCTION BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 421606710 DUE TO SPECIAL / PROGRESS INSPECTOR CLAIMED FRAUDULENT FILING. UNABLE TO DETERMINE THE PERCENTAGE OF WORK COMPLETED. #20-00381 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 14, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. DOB-FTC VIO #051526PI40709SB AND DOB-CONTROL #370493 DATED 05/15/2026. NO COMPLIANCE ON FILE FOR CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S O | Open |