Brooklyn · Block 6571 · Lot 11 · 11230

1320 East 9 Street

4 floors · 32 apartments · 23,750 sq ft · built 1927 · class C1 · owner of record: Avenues I - Ocean Rty Cp

14open violations
$0ECB/OATH penalties owed
3HPD class C (immediately hazardous)
46dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 46 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 62 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 290 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 411 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-07 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2102767
DOB VIOLATION - ACTIVE
Aug 2, 2020FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01288
DOB VIOLATION - ACTIVE
May 2, 2020FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01288
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Dec 1, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
Aug 2, 2020Benchmarking - LL84 FTF-EN-BENCH
Active
May 2, 2020Benchmarking - LL84 FTF-EN-BENCH
Active
HPD (8) · C 3 · B 4 · A 1
IssuedClassViolationCorrect by
Sep 28, 2026AApt 1F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJan 1, 2027
Sep 28, 2026CApt 1F · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOct 4, 2026
Sep 28, 2026BApt 1F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EASTNov 2, 2026
Jun 19, 2024BApt 4G · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTJul 24, 2024
Jun 19, 2024C§ 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE TO ROOF AT BULKHEAD AT PUBLIC HALL, 4th STORYJun 25, 2024
Jun 19, 2024C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR TO CELLAR AT BOILER ROOMJun 25, 2024
Jun 19, 2024BApt 2E · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERATIVE LOCATED AT APT 2E, 2nd STORY, APARTMENT AT SOUTHJul 24, 2024
Jun 19, 2024BApt 2E · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERATIVE LOCATED AT APT 2E, 2nd STORY, APARTMENT AT SOUTHJul 24, 2024

Issued in the last 120 days

DateSourceWhatNow
Sep 28, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD C§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 28, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EASTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 2:33 AM ET. BBL 3065710011.

Look up another building