9 floors · 30,375 sq ft · built 1939 · class H3 · owner of record: 47th Hotel Associates Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $465,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 98 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 30,375 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1142 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 26, 2026 | Construction CLASS - 2 FAILURE TO SUBMIT A CERTIFICATE OF CORRECTION OF VIOLATION #39103487X ISSUED ON 01-14-2024 FOR FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER(PLEXIGLASS DISLODGED FROM ABOVE PARAPET ROOF), FILE A CERTIFI #39193971J | Oct 22, 2026 IN VIOLATION | $1,250 |
| Jan 17, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTE:-AS PER TODAY FACADE INSPECTION OBSERVED, IMPROPERLY INSTALLED PLEXIGLASS AND GLASS PANALLED STORE FRONT TYPE WALLINGS AND ROOFING. REMEDY: MAINTAIN E #35679886J | Jan 9, 2025 IN VIOLATION | $1,250 |
| Jan 14, 2024 | Construction CLASS - 1 SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE SECTION OF PLEXIGLASS DISLODGING FROM ABOVE PARAPET ROOF FROM THE RESTAURANT AREA OF STRUCTURE FALLING TO SIDEWALK AND DAMAGING A MOTOR VEHICLE AT EXPOSURE #4 SIDE OF #39103487X | Jan 9, 2025 IN VIOLATION | $1,250 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A AND 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#903062.AGG1:PRIOR NOV 37021142Z #37024239Z | Aug 24, 2023 IN VIOLATION | $0 |
| Aug 18, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDERS TO FILE A CERTIFICATEOF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR THE ECB VIOLATION# 35139091Z ISSUED ON 8/24/2015 PURSUANT TO SECTION 28-204.2.REMEDY:FILE #35590164R | Mar 31, 2022 IN VIOLATION | $0 |
| Sep 25, 2017 | Unknown CLASS - 2 FAILURE TO FILE A FINAL INSP FOR COMPLETED WORK W/IN 1 YEAR OF PERMIT EXPIRATION. ALT-II PC JOB# 120207123 WHICH ENTAILS SPRINKLERS SYSTEM FROM 1ST FLR TO 9TH FLR IS COMPLETE & SUBSTANTIALLY COMPLIANT TO PLAN, #35261736X | Feb 8, 2018 IN VIOLATION | $0 |
| Aug 24, 2015 | Construction CLASS - 1 WORK W/O A PERMT: ILLEGAL WORK NOTEDOVER 9TH FLR OF 132 BLDG ROOF (PENTHOUSE LEVEL ERECTED WOODEN ROOF STRUCTURE FRAMING WITH FABRIC,PLEXI GLASS ROOF COVERING OVER OUTDOOR LOUNGE (HAVEEN ROOFTOP) ALL WORK 100% #35139091Z | Jul 21, 2016 IN VIOLATION | $0 |
| Jan 27, 2010 | Construction CLASS - 2 FAIL TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTEDD TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT. REMEDY: FILE ARCHITECT/ENGINEER REPORT. #36011873R | Aug 26, 2010 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 14, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDNG IN CODE COMPLIANT MANNER. AT TIME OF ISNPE CTIONOBSERVED PLEXIGLASS ROOF TOP WITH A SECTION MISSING AND ANOTHER BROKEN WHICH FELL TO SIDEWALK DAMAGING CAR. PLEXIGLASS ROOF TOP COVE R NEEDS TO BE MAITAIN TO SUSTAIN WIND AND WEATHER #CER01CM | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00295 | DOB VIOLATION - ACTIVE |
| Sep 21, 2020 | ELEVATOR #9027/686981 | DOB VIOLATION - ACTIVE |
| Sep 21, 2020 | ELEVATOR #9027/686982 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #01083 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF42948 | DOB VIOLATION - ACTIVE |
| Jul 1, 1992 | LOCAL LAW 10/80 - FACADE #NRF0428 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 4, 2008 | A | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR TO CLOTH CLOSET 8TH STY ROOM 80A. | Sep 7, 2008 |
| Jun 4, 2008 | A | D26-10.01 ADM CODE REFIT DOOR TO CLOTH CLOSET 8TH STY ROOM 80A. | Sep 7, 2008 |
| Jun 4, 2008 | A | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING STRIKE PLATE AT DOOR TO ROOM 62 AT 6TH STY. | Sep 7, 2008 |
| Jun 4, 2008 | B | D26-20.08,20.09 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS 9TH STY NORTH WEST ROOM 92. | Jul 9, 2008 |
| Jun 4, 2008 | B | D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB OF ROOM 94 9TH STY BATHROOM. | Jul 9, 2008 |
| Jun 4, 2008 | B | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING HANDLE OF FAUCET 9TH STY ROOM 94 BATHROOM. | Jul 9, 2008 |
| Jun 4, 2008 | B | D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS WASHBASIN OF ROOM 89 8TH STY. | Jul 9, 2008 |
| Jun 4, 2008 | A | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING SASH CHAIN AT ROOM 89 8TH STY. | Sep 7, 2008 |
| Jun 4, 2008 | B | D26-20.08,20.09 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS ROOM 83 8TH STY. | Jul 9, 2008 |
| Jun 4, 2008 | A | D26-10.01 ADM CODE REFIT DOOR CLOTH CLOSET OF ROOM 83 8TH STY. | Sep 7, 2008 |
| Jun 4, 2008 | A | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING STRIKE PLATE AT ENTRANCE DOOR TO ROOM 83 8TH STY. | Sep 7, 2008 |
| Jun 4, 2008 | A | D26-12.01 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS OF ROOM 80A AT 8TH STY. | Sep 7, 2008 |
| Jun 4, 2008 | A | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING SASH CHAIN AT ROOM 80A 8TH STY. | Sep 7, 2008 |
| Jun 4, 2008 | B | D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF UNCAPPED GAS LINE AT WEST WALL OF ROOM 80A 8TH STY. | Jul 9, 2008 |
| Jun 4, 2008 | A | D26-10.01 ADM CODE REFIT DOOR TO BATHROOM ROOM 80A 8TH STY. | Sep 7, 2008 |
| Jun 4, 2008 | B | D26-16.01 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ROOM 80A BATHROOM CLOSET 8TH STY. | Jul 9, 2008 |
| Jun 4, 2008 | B | D26-10.01 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRIC WIRE AT EAST WALL OF ROOM 62 AT 6TH. | Jul 9, 2008 |
| Jun 4, 2008 | A | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING EAST AIRSHAFT. | Sep 7, 2008 |
| Jun 4, 2008 | B | D26-11.01, 11.03, 11.05 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE UNDER STAIR AT FRONT AREAWAY. | Jul 9, 2008 |
| Jun 4, 2008 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING INSTALLED AT ROOM 40 4TH STY. | Sep 7, 2008 |
| Jun 4, 2008 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILINGS INSTALLED ALL STYS PUBLIC HALL. | Sep 7, 2008 |
| Jun 4, 2008 | B | D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING OF BATHROOM 9TH STY ROOM 91. | Jul 9, 2008 |
| Jun 4, 2008 | B | D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING HANDLES AT FAUCET SHOWER COMPARTMENT 9TH STY ROOM 91. | Jul 9, 2008 |
| Jun 4, 2008 | B | D26-10.01 ADM CODE PROPERLY SECURE THE LOOSE LIGHT FIXTURE WALL OF BATHROOM 9TH STY ROOM 91. | Jul 9, 2008 |
| Jun 4, 2008 | B | D26-15.01 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES WASHBASIN ROOM 35 3RD STY. | Jul 9, 2008 |
| Jun 4, 2008 | B | D26-16.01 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SHOWER HEAD 2ND STY ROOM 21 BATHROOM. | Jul 9, 2008 |
| Jul 28, 2006 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Nov 12, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)