6 floors · 15 apartments · 10,854 sq ft · built 2024 · class D6 · owner of record: 132 W Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 776 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 31, 2025 | Construction CLASS - 2 @ THE TIME OF INSPECTION OBSERVED CONDENSING PIPE INSTALLED FROM GROUND TO ROOF NO PERMIT ISSUED FOR THAT WORK, OBTAIN ALL PERMITS; STOP ALL MS WORK ONLY OBTAIN MS PERMIT FOR THAT WORK.HTTPS://WWW1.NYC.GOV/SITE #39137184Y | Nov 10, 2025 IN VIOLATION | $1,250 |
| Jan 31, 2025 | Construction CLASS - 2 @ THE TIME OF INSPECTION OBSERVED EXTERIOR WALLS WITH WINDOWS REQUESTED EN PLANS NOT PROVIDED, MAINTAIN/DISPLAY REQUIRED DOCUMENTS; MAINTAIN EN PLANS ON SITE. HTTPS://WWW1.NYC.GOV/SITE/BUILDINGS/CODES/ENERGY #39137183M | May 8, 2025 IN VIOLATION | $1,250 |
| Jul 17, 2024 | Construction CLASS - 2 AT TIME OF INSPECTION OF 6 STORY NEW BUILDING OBSERVED SIDEWALK SHED IN PLACE NOT CODE COMPLIANT: OBSTRUCTION OF TRAFFIC SIGNS AND VERTICAL MEMBERS NOT 18" FROM CURBLINE CAUSING HAZARDOUS CONDITIONSMAINTAIN PER #39530605Y | Aug 21, 2025 IN VIOLATION | $2,400 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 4:14 PM ET. BBL 1019180054.