3 floors · 3 apartments · 2,862 sq ft · built 1899 · class C0 · owner of record: Perlstein, Josef
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 787 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 10, 2012 | Plumbing CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.INSTALLATION OF PLUMBING MATERIALS/EQUIPMENT PER PC.102.3;27-902.NOTE IN BASEMENT AREA FERNACE COUPLING WAS FOUND CONNECTING CAST IRON PIPE AND PVC PIPE.CORRECT #34943279L | Feb 27, 2012 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 2, 2025 | A | Apt 1 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING CREATED AT FLOOR AND WOOD STAIRS INSTALLED LEADING DOWN TO CELLAR IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTM | Oct 5, 2025 |
| Apr 25, 2011 | B | SECTION 27-2081 ADM CODE DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES AND PROPERLY SEAL PIPE CONNECTIONS AT BATHROOM AT CELLAR | May 30, 2011 |
| Jun 24, 2010 | B | Apt 3 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... 2SQFT AT CEILING IN THE FOYER LOCATED AT APT 3, 3rd STORY, APARTMENT AT WEST | Jul 29, 2010 |
| Mar 2, 1999 | C | Apt 3 · SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT AND OR BROKEN PLASTER CEILING CENTER ROOM 3 STY APT 3 WILKERSON NO PHONE 20098. , SECTION '' '' | Mar 22, 1999 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 12:35 AM ET. BBL 3017370029.