6 floors · 69,700 sq ft · built 2005 · class H2 · owner of record: Mlt Canyon Llc C/O J
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 11886). Agency page | Dec 31, 2026 in 42 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 69,700 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 163 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 163 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 773 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 21, 2026 | Construction CLASS - 1 ATOI LOCATED IN BASEMENT PVC USED FOR DRAINAGE WHICH IS CONTRARY TO PC 1101.10 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER., REPAIR AND/REPLACE #39196912N | Nov 24, 2026 PENDING | $2,500 |
| Jul 21, 2026 | Unknown CLASS - 1 ELECTRICAL CLOSET NOT DEDICATED TO ELECTRICAL DISTRIBUTION EQUIPMENT ONLY. OBSERVED IN THE ELECTRICAL CLOSET THRU OUT THE INSTALLATION OF CAMERA, WIFI , TELEPHONE EQUIPMENT IS INSTALLED. ALL ELECTRICAL CLOSETS #39196920N | Nov 24, 2026 PENDING | $1,200 |
| Jul 21, 2026 | Unknown CLASS - 1 ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED IN THE KITCHEN NEW ELECTRIC OVEN 35 AMP INSTALLED AND IN THE KITCHEN NEW 30 AMP LINE INSTALLED ALSO IN STAIRWAY A & B NEW EMERGENCY LIGHTS INSTALLED CHECKED BIS / DOB #39196918Y | Nov 24, 2026 PENDING | $2,500 |
| Jul 21, 2026 | Construction CLASS - 1 ATOI OBSERVED OBSRTUCTED SPRINKLER HEADS THROUGHOUT THE BUILDING ALSO ON 6TH FLOOR OPEN DRAIN LINE AS PER FGC 903.3.3 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER, REPAIR AND/REPLACE #39196911L | Nov 24, 2026 | $2,500 |
| Jul 8, 2026 | Boilers CLASS - 3 @7TH FL HW ROOM>#2+#3AO SMITH HWH'S ARE NOT OPERABLE/@6TH FL HW ROOM>#1AO SMITH HWH IS NOT OPERABLE+CHIMNEY TERMINATION IS INCORRECT/@5TH FL HW ROOM>#1AO SMITH HWH HAS INCORRECT DISCHARGE PIPE+#5AO SMITH HWH IS #39195137R | Mar 16, 2027 PENDING | $500 |
| Jul 8, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED GAS ODOR COMING FROM GAS METER ROOM. GAS LEAK WAS FOUND FOLLOWING SHUT OFF BY NATIONAL GRID., REPAIR AND/REPLACE #39195231N | Mar 16, 2027 PENDING | $2,500 |
| Jul 8, 2026 | Construction CLASS - 1 OBSERVED NEWLY INSTALLED GAS PIPING SERVING WATER HEATERS. AN LIMITED ALTERATION APPLICATION (LAA) WAS SIGNED OFF IN MAY 2023 (JOB NO. Q08055575-L1-LA); HOWEVER, THE OBSERVED WORK WAS PERFORMED OUTSIDE THE APPR #39195230L | Mar 16, 2027 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #01921 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #00888 | DOB VIOLATION - ACTIVE |
| Sep 9, 2013 | ELEVATOR #9027/482739 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 7:12 AM ET. BBL 4118860010.