Queens · Block 11487 · Lot 1 · 11417

132-05 Cross Bay Boulevard

2 floors · 1 apartments · 9,761 sq ft · built 1958 · class M1 · owner of record: Solid Rock Pentecostal Fellowship Church , Inc

6open violations
$16,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
778dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-25 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $16,250 owed
IssuedViolationHearingBalance
Feb 12, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.AT TIME OF INSPECTION,CONTRACTOR HAS FAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION
#39550321K
Apr 21, 2026
DEFAULT
$6,250
Dec 19, 2025Unknown CLASS - 1
AT EXPOSER #$THE SUPPORTED SCAFFOLD PLANKS ARE NOT TIED DOWN CREATING AN IMMEDIATE HAZARD (WITH THE WIND AT 53.5MPH AT 2;15PM) TO THE PUBLIC. INFRACTION CODE 3301.5 PSWO - STOP ALL EXTERIOR OPERATIONS AND US
#39548144X
Feb 24, 2026
DEFAULT
$10,000
DOB (1)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#19169
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 10)
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 3:58 AM ET. BBL 4114870001.

Look up another building