Manhattan · Block 2177 · Lot 218 · 10033

1314 Riverside Drive

6 floors · 64 apartments · 41,310 sq ft · built 1926 · class C1 · owner of record: Hp Csp Gf1 Housing Development Fund Comp Any, Inc.

40open violations
$1,250ECB/OATH penalties owed
3HPD class C (immediately hazardous)
68dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-09-24 (Accepted). Agency page

Dec 31, 2026
in 68 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 41,310 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 312 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 433 days
Next cycle year 2027

Open violations

ECB / OATH (2) · $1,250 owed
IssuedViolationHearingBalance
Apr 4, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. NOTED AT TIMEOF INSPECTION OBSERVED:-SPALLING AND CRACKED BRICK AT EXPOSURE #4(RW) AT THE COURTYARD. REMEDY: REPAIR AND/OR REPLACE.
#35726916K
Feb 11, 2027
$1,250
Mar 21, 2024Construction CLASS - 2
OBSERVED FIRST FLOOR APARTMENT A LACK VENTILATION FOR GAS METER. GAS METER LOCATED INSIDE OF CABINET WITH STORAGE ALSO CAN NOT SHUT OFF WATER TO BATHTUB WHICH CONTRARY TO FGC APPENDIX E.3, REPAIR AND/OR REPLACE
#39109466Y
May 30, 2024
DEFAULT
$0
DOB (13)
IssuedViolationStatus
May 5, 2020CONSTRUCTION
REQUEST ADDT'L INFORMATION. RESPONDED IS DIRECTED TO PROVIDE A REVISED TR16 REPORT IN ACCORDANCE WITH 1RCNY 103-09 ALONG WITH DETAILED CALS, DWGS,FOUNDATION DETAILS,SOIL TYPES ETC,IDENTIFYING THE FACTUAL BASIS (INCL. DATES PE VISITED SITE)REMEDY: RESPONDENT SHOULD EXPLAIN THE METHODOLOGY. PROVIDE RE
#RW1208BH
DOB VIOLATION - ACTIVE
Jan 15, 2013CONSTRUCTION

#CERDL02
DOB VIOLATION - ACTIVE
Jan 6, 1998LOCAL LAW 10/81 - ELEVATOR

#01384
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01828
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01825
DOB VIOLATION - ACTIVE
Mar 8, 1996LOCAL LAW 10/81 - ELEVATOR

#01579
DOB VIOLATION - ACTIVE
Apr 17, 1995LOCAL LAW 10/81 - ELEVATOR

#01969
DOB VIOLATION - ACTIVE
May 31, 1994LOCAL LAW 10/81 - ELEVATOR

#03342
DOB VIOLATION - ACTIVE
Jun 28, 1993LOCAL LAW 10/81 - ELEVATOR
1
#02082
DOB VIOLATION - ACTIVE
Apr 7, 1992LOCAL LAW 10/81 - ELEVATOR
1
#02138
DOB VIOLATION - ACTIVE
Apr 25, 1991LOCAL LAW 10/81 - ELEVATOR
1
#01555
DOB VIOLATION - ACTIVE
Jun 29, 1990LOCAL LAW 10/81 - ELEVATOR
1
#02360
DOB VIOLATION - ACTIVE
Oct 12, 1989LOCAL LAW 10/81 - ELEVATOR
1
#03161
DOB VIOLATION - ACTIVE
DOB NOW Safety (11)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Jan 6, 1998Elevators LL1081
Active
Jan 13, 1997Elevators LL1081
Active
Mar 8, 1996Elevators LL1081
Active
Apr 17, 1995Elevators LL1081
Active
May 31, 1994Elevators LL1081
Active
Jun 28, 1993Elevators LL1081
Active
Apr 7, 1992Elevators LL1081
Active
Apr 25, 1991Elevators LL1081
Active
Jun 29, 1990Elevators LL1081
Active
Oct 12, 1989Elevators LL1081
Active
HPD (15) · C 3 · B 10 · A 2
IssuedClassViolationCorrect by
Oct 16, 2026AApt 1B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT 1st CLOSET FROM SOUTH AT WEST WALL CEILING IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJan 19, 2027
Oct 16, 2026BApt 1B · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE IN THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTNov 20, 2026
Oct 16, 2026AApt 1B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH, THE BATHROOM , THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJan 19, 2027
Oct 15, 2026CApt 5G · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 15, 2026
May 22, 2026BApt 5G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTJun 26, 2026
Aug 8, 2025BApt A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT A, 1st STORY, 1st APARTMENT FROM WEST AT NORTHSep 12, 2025
Aug 8, 2025BApt A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT A, 1st STORY, 1st APARTMENT FROM WEST AT NORTHSep 12, 2025
Oct 26, 2023CApt 5C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 6th STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 21, 2023
Oct 10, 2023CApt 2E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTNov 17, 2023
Jul 10, 2023BApt 3J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1320''Aug 14, 2023
Jul 10, 2023BApt 3J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1320''Aug 14, 2023
Jul 10, 2023BApt 3J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1320''Aug 14, 2023
Jul 10, 2023BApt 3J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE FOYER LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1320''Aug 14, 2023
Jul 10, 2023BApt 3J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1320''Aug 14, 2023
Jul 10, 2023BApt 3J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''1320''Aug 14, 2023

Issued in the last 120 days

DateSourceWhatNow
Oct 16, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT 1st CLOSET FROM SOUTH AT WEST WALL CEILING IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 16, 2026HPD B§ 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE OR PROVIDE APPROVED TYPE GATE IN THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 16, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH, THE BATHROOM , THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 15, 2026HPD C§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTOpen
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 12:47 AM ET. BBL 1021770218.

Look up another building