5 floors · 24 apartments · 18,500 sq ft · built 1915 · class C1 · owner of record: Nagle Avenue Heights Associates, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 6, 2022 | Construction CLASS - 2 FAILURE TO SAFE GUARD ALL PERSONS AND PROPERTY. AT TIME OF INSPECTION OBSERVED AT EXPOSURE #1 WHERE SIDEWALK SHED HAS BEEN ERECTED, A SECTION OF STEEL DECKING INSTALLED INTO PATHWAY OF FIRE ESCAPE DROP LADDER O #39065282H | Aug 25, 2022 DEFAULT | $5,000 |
| Oct 12, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35360281M ISSUED ON 8/29/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSIO #35389899N | Dec 6, 2018 DEFAULT | $3,125 |
| Aug 29, 2018 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS. NOTED: PER HPD RECORDS# 100446 INDICATES 25 UNITS, 0 AT BASEMENT & 0 AT CELLAR, OBSERVED @ CELLAR/BASEMENT 2 CLASS 'A' APTS. EACH APT HAD 3 SRO'S #35360281M | Mar 21, 2019 IN VIOLATION | $2,400 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 13, 2026 | B | Apt BLDG · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT BLDG, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 18, 2026 |
| Apr 13, 2026 | B | Apt BLDG · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT SOUTH, NORTH AND WEST WALLS IN THE BATHROOM LOCATED AT APT BLDG, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 18, 2026 |
| Apr 7, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT AT BOILER ROOM | Apr 13, 2026 |
| Apr 7, 2026 | C | Apt 25 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 25, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 7, 2026 |
| Dec 17, 2024 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 12, 2025 |
| Sep 23, 2024 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONENTS AT ALL STORIES BALCONIES FIRE ESCAPE AT FRONT INNER COURT AT SOUTH | Dec 27, 2024 |
| Aug 12, 2024 | C | Apt 1 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT STOVE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 18, 2024 |
| Jul 23, 2024 | C | §27-2005 (E) HMC: PROVIDE WRITTEN NOTICE TO THE TENANTS AT LEAST TWENTY-FOUR HOURS PRIOR TO ESSENTIAL SERVICE INTERRUPTION BY POSTING A NOTICE IN A PROMINENT PLACE WITHIN THE PUBLIC PART OF THE BUILDING AND ON EACH FLOOR OF SUCH BUILDING, WHERE AN OWNER MUST MAKE A REPAIR THAT MAY RESULT IN AN INTER | Jul 29, 2024 |
| Jul 23, 2024 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 18, 2024 |
| May 23, 2024 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT WEST | Jun 18, 2024 |
| Feb 27, 2023 | B | Apt 26 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD VANITY IN THE BATHROOM LOCATED AT APT 26, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 3, 2023 |
| Feb 27, 2023 | B | Apt 26 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 26, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 3, 2023 |
| Feb 27, 2023 | B | Apt 26 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS INSIDE CLOSET IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 26, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 3, 2023 |
| Jun 27, 2018 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES ALL COMPONENTS AT BUILIDNG FRONT AT FIRE ESCAPE | Sep 30, 2018 |
| Jun 27, 2018 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CORNICE AT ROOF BUILDING FRONT | Aug 1, 2018 |
| Mar 26, 2007 | B | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING , EAST AND SOUTH WALLS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 42, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | May 5, 2007 |
| Mar 26, 2007 | B | Apt 42 · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 42, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | May 5, 2007 |
| Jun 22, 2004 | B | Apt 42 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE BASE CABINET IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 1, 2004 |
| Apr 29, 1997 | A | Apt 42 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING ALL ROOMS ETC 4 STY EAST APT 42. , SECTION '' '' | Aug 15, 1997 |
| Aug 30, 1994 | B | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALLS THROUGHOUT 4 STY NORTHEAST APT 42. , SECTION '' '' | Oct 17, 1994 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 7:07 PM ET. BBL 1021730021.