15 apartments · 5,748 sq ft · built 2025 · class H3 · owner of record: 40th Road Realty Group Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 15, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED INADEQUATE HOUSEKEEPING WITH PLASTIC BAGS, WOOD PALLETS, AND SCRAPS NOT PROPERLY STORED IN A NON COMBUSTIBLE CONTAINER TO PREVENT FIRE FROM SPREADING IN THE EVENT ONE WERE TO OCCU #39556647H | Nov 10, 2026 | $2,500 |
| Jun 4, 2026 | Construction CLASS - 1 OBSERVED WORKER USING GRINDER WITH MISSING GUARD CONTRARY TO MANUFACTURER SPECIFICATIONS. USING A GRINDER WITHOUT THE REQUIRED GUARD CREATES HAZARDOUS CONDITIONS IF BLADE WERE TO SHATTER OR DISLODGE THAT CAN RE #39555019M | Aug 11, 2026 IN VIOLATION | $2,500 |
| Jun 2, 2026 | Construction CLASS - 2 WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED MECHANICAL WORK BEING PERFORMED WITHOUT PW2 FILED ON MS FILING ON DOB SYSTEM. REMEDY: PLEASE SUBMIT PERMIT TO ENERGY CODE INSPECTIONS @BUILDINGS.NYC.GOV. #35685979J | Sep 11, 2026 DEFAULT | $1,280 |
| Apr 21, 2026 | Construction CLASS - 1 OBSERVED: ATOI HOUSEKEEPING ISSUES IN SEVERAL PLACES DIFERENTS LEVELS LIKE MATERIAL DEBRIS , WOOD FROM STRIPING OPERATIONS AND BLACK GARBAGE BAGS CREATING HAZARDS FOR WORKERS ON SITE AND CONTRARY TO BUILDING C #39553247P | Jun 30, 2026 IN VIOLATION | $1,250 |
| Apr 21, 2026 | Construction CLASS - 1 OBSERVED: AT BULKHEAD LEVEL INADEQUATE GUARDRAILS .MISSING TOE BOARDS AND NETTING CREATING HAZARDS CONDITIONS FOR WORKERS ON SITE AND CONTRARY TO BUILDING CODE STOP ALL WORK UNDER PERMIT 421133810 MAINTAIN ADE #39553248R | Jun 30, 2026 IN VIOLATION | $5,000 |
| Feb 21, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED JOB SITE CLOSED. NO WATCHPERSON PRESENTS AT JOB SITE. THE JOB SITE FOOTPRINT MORE THAN 5000 SFT. WALKED AROUND THE JOB SITE KNOCKED THE DOOR NONE WAS RESPONSE AS PER CODE 3303.3 W #39550668J | Apr 28, 2026 IN VIOLATION | $2,500 |
| Feb 18, 2026 | Construction CLASS - 2 ACTIVE 12-STORY MB. NOTED MAKESHIFT ADJACENT PROPERTY PROTECTION INSTALLED @EXPO2 ATOP NEIGHBORS CANOPY. UPON REQUEST, AN INCOMPLETE SET OF DESIGN DRAWINGS WAS PROVIDED. DESIGN DRAWING WAS ONLY ONE PAGE & DID N #39550512N | Apr 28, 2026 IN VIOLATION | $1,250 |
| Feb 18, 2026 | Unknown CLASS - 1 OBSERVED ACTIVE 12 STORY MAJOR BUILDING. NOTED STAY-FORM WAS INSTALLED AT EXPOSURE 2 ON 5TH FLOOR SETBACK. UPON REQUEST FOR DESIGN DRAWINGS AND PE REPORTS FOR THE STAY-FORM, NONE WAS PROVIDED TO ME AS REQUIRED #39550509M | Apr 28, 2026 IN VIOLATION | $5,000 |
| Feb 18, 2026 | Unknown CLASS - 2 12STORY MB. CONCRETE OPS 8TH THRU 12TH FLOOR IN UNSAFE CONDITION PER 3305.3. RESHORE POSTS NOT PLUMB @MANY LOCATIONS, NO SITE-SPECIFIC RESHORE DESIGN DRAWINGS, MIX-MATCHED CONCRETE RESHORES USED & NOT SECURED @ #39550508K | Apr 28, 2026 IN VIOLATION | $2,500 |
| Feb 18, 2026 | Unknown CLASS - 2 ACTIVE 12 STORY MB. NOTED MULTIPLE VIOLATING UNSAFE CONDITIONS. SSP DOES NOT REFLECT CURRENT SITE CONDITIONS, INADEQUATE AND MISSING DOCUMENTS ON SITE, CONCRETE OPS. ARE IN UNSAFE CONDITION. SSM#2268 FAILED TO #39550514R | Dec 9, 2026 | $2,500 |
| Feb 18, 2026 | Unknown CLASS - 2 ACTIVE 12-STORY MB. 3301.6.5 OBSERVED PIPE SCAFFOLD INSTALLED AT EXPOSURE 1,2,3,4. UPON REVIEW OF DOB APPROVED PLANS NOTED THAT PIPE SCAFFOLD INSTALLED AT EXPOSURE 2 WAS NOT SHOWN ON PLANS. ALSO NOTED PIPE SCAF #39550513P | Apr 28, 2026 IN VIOLATION | $2,500 |
| Feb 18, 2026 | Construction CLASS - 2 ACTIVE 12-STORY MB, NOTED INADEQUATE HOUSEKEEPING IN SEVERAL LOCATIONS THRUOUT SITE. GREAT AMOUNTS OF COMBUSTIBLE CONSTRUCTION DEBRIS & LEANING ON RESHORES/NOT ADEQUATELY STORED OR REMOVED PER CODE. FIRE/RODENT #39550510J | Apr 28, 2026 IN VIOLATION | $1,250 |
| Feb 18, 2026 | Unknown CLASS - 2 OBSERVED SIDEWALK SHED AT EXPOSURE 1 INSTALLED PARTIALLY IN THE ROADWAY. THE OUTER POSTS WERE PLACED ON THE STREET. THIS CONDITION REQUIRES DOT PERMITS FOR STREET OCCUPANCY. UPON REVIEW OF DOT RECORDS NOTED THA #39550511L | Apr 28, 2026 IN VIOLATION | $625 |
| Jan 31, 2026 | Unknown CLASS - 2 ATOI OF A 12-STORY NEW BUILDING, BUILDING APPX. 57,705 SQ FT. SITE CLOSED AND THERE WAS NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATCHPERSON AND TO VERIFY COMP #39549712J | May 12, 2026 IN VIOLATION | $2,500 |
| Dec 20, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED JOB SITE CLOSED. THE SIDEWALK SHED ROOF PARAPET DAMAGE CONDITIONS. CREATED AN UNSAFE CONDITION FOR PEDESTRIANS. MAINTAIN SIDEWALK SHED. COMPLY WITH CODE #39548208X | Sep 3, 2026 IN VIOLATION | $2,400 |
| Dec 20, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED JOB SITE CLOSED, SOME PLYWOOD FOUND ON STREET THAT FELL FROM THE BUILDING ALSO SIDEWALK SHED ROOF PARAPET DAMAGE, NO HORIZONTAL NETTING OR ALTERNANT SYSTEM SCAFFOLD INADEQUATE, CR #39548207Y | Sep 3, 2026 IN VIOLATION | $10,000 |
| Dec 20, 2025 | Unknown CLASS - 1 AT TIME OF INSPECTION OBSERVED SIDEWALK NOT MAINTAIN AT EXPOSE 1 MUDSILL ON WALKWAY NOT 5 FEET WIDE. CREATED AN UNSAFE CONDITION FOR PEDESTRIAN PASSING THE JOB SITE UNDER SIDEWALK SHED. COMPLY WITH CODE. COMPLY #39548209H | Sep 3, 2026 IN VIOLATION | $1,250 |
| Dec 20, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED JOB SITE CLOSED. THE SIDEWALK SHED INSTALLED ON WALKWAY AT EXPOSE ONE WITH MISSING INFORMATION PANEL AS REQUIRED. CREATED AN UNSAFE CONDITION. PROVIDE SIDEWALK SHED INFORMATION PA #39548210P | Feb 24, 2026 IN VIOLATION | $1,250 |
| Oct 27, 2025 | Construction CLASS - 2 OBSERVED NEEDLE BEAMS AT EXP#2 INSTALLED NOT AS PER PLANS-INSTALLED SINGLE BEAM-AS PER PLAN DOUBLE BEAMS TO BE USED,FRONT ATTACHMENT -USING THROUGH SLAB ANGLE CLAMPS,AS PER PLAN FRONT BEAMS SHALL BE ANCHORED TO #39546378J | Dec 22, 2026 DEFAULT | $1,280 |
| Sep 11, 2025 | Unknown CLASS - 1 BC3316.1 HOIST IN READINESS: DURING INSPECTION OF A SITE AT THE 11 STORY, I OBSERVED THAT THE INTERIOR ELEVATOR WAS NOT ELECTRIFIED, WAS CLOSED & LOCKED AND ONLY WENT UP TO THE 4TH FLOOR. AS PER CODE THE HOIST #39544764Z | May 12, 2026 IN VIOLATION | $5,000 |
| Aug 12, 2025 | Unknown CLASS - 1 DURING INSPECTION OF A PROPOSED 12 STORY BUILDING AT 9 STORIES, I REQUESTED FOR THE STANDPIPE TESTING INFORMATION AND ELECTRICAL PERMIT FOR THE DRY STANDPIPE, NONE WAS PROVIDED. DOB RECORDS INDICATED THAT THERE #39543564J | Oct 21, 2025 IN VIOLATION | $800 |
| Jul 22, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED WORKERS ON AN ACTIVE JOBSITE, WORKING ON LEADING EDGES WITHOUT FALL PREVENTION OR FALL ARREST SYSTEMS IN PLACE. WORKERS NOT TIED OFF AND NO GUARDRAIL SYSTEM IN PLACE TO PREVENT FA #39542663K | Apr 6, 2026 DEFAULT | $12,500 |
| Jul 22, 2025 | Unknown CLASS - 2 AT INSPECTION, SUPPORTED SCAFFOLD WAS NOT PER DESIGN: MISSING PINS, OVER STACKED PLANKS, UNSECURED ELEMENTS. TIE-BACK ANCHORS PLACED ON BOTTOM OF FRAME LEGS, NOT MID/TOP AS PER DRAWINGS. THIS CREATES COLLAPSE R #39542664M | Oct 27, 2026 DEFAULT | $2,530 |
| Jul 22, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE, WITH INADEQUATE FALL PREVENTION SYSTEMS IN PLACE, GUARDRAIL SYSTEMS MISSING TOE BOARDS ON 7TH AND 8TH FLOOR LEVEL, THIS CREATES A RISK OF FALLING DEBRIS. PROVIDE A #39542665Y | Oct 27, 2026 DEFAULT | $2,530 |
| Feb 4, 2025 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION I OBSERVED THAT THERE WERE NO PARAPET WALL WHERE THERE WERE CHANGES IN HEIGHT TO THE SIDE WALK SHED INSTALLED. #39536571M | Jan 26, 2026 DEFAULT | $5,000 |
| Dec 17, 2024 | Construction CLASS - 2 UPON INSPECTION I OBSERVED PEDESTRIAN PROTECTION (SIDEWALK SHED) INSTALLED AT EXPOSURE 1 CONTRARY TO CODE. SIDEWALK SHED VERTICAL BEAMS PLACED CLOSER THAN 18 INCHES TO THE FACE OF THE CURB LINE CONTRARY TO CODE #39535214J | Feb 25, 2025 IN VIOLATION | $2,400 |
| Oct 18, 2024 | Construction CLASS - 2 I OBSERVED PEDESTRIAN PROTECTION (SIDEWALK SHED) INSTALLED AT EXPOS 1 CONTRARY TO CODES: 3307.6.4.7 HEIGHT. PIPE HEADERS SET BELOW 8FT MIN HEIGHT ACROSS SPAN IN FRONT OF NEIGHBORING ENTRY/EXIT & STAIRS. 3307.6. #39533564K | Jan 28, 2025 IN VIOLATION | $2,400 |
| Aug 29, 2024 | Construction CLASS - 2 OBSERVED PROPOSED 12 STR NB AT THE 6TH FLR LVL WITH RE-SHORING INSTALLED IN AT LEAST 1 AREA, AND CONCRETE SAFETY STRAPS THROUGHOUT FLRS 1 THRU 5- AT LEAST 2 IN USE BY WORKERS. UPON REQUEST FOR THE RE-SHORING PL #39531969J | Nov 12, 2024 IN VIOLATION | $1,250 |
| Aug 29, 2024 | Unknown CLASS - 2 BC 3307.4 WARNING SIGNS, PERSONNEL, AND BARRIERS. OBSERVED A CONCRETE-WASHOUT BOX PLACED IN THE ROADWAY AT EXP#1 WITH NO BARRIERS OR ANY OTHER PROTECTION PROVIDED TO SEPARATE VEHICULAR TRAFFIC FROM THE STORAGE #39531967X | Nov 12, 2024 IN VIOLATION | $2,500 |
| May 3, 2024 | Construction CLASS - 1 @ACTIVE SITE WITH STOP WORK ORDER IN EFFECT COMPLAINT#4957454 VIOS#39528050R/51Z/61M"STOP ALL WORK WITHIN 10FT OF EXP#4 ABOVE 2ND FLOOR, STRIPPING OPERATIONS, OCCUPANCY OF ROADWAY FOR SITES OPERATIONS"OBSERVE S #39528257Y | Oct 5, 2026 IN VIOLATION | $5,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 15, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED INADEQUATE HOUSEKEEPING WITH PLASTIC BAGS, WOOD PALLETS, AND SCRAPS NOT PROPERLY STORED IN A NON COMBUSTIBLE CONTAINER TO PREVENT FIRE FROM SPREADING IN THE EVENT ONE WERE TO OCCU | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 6:59 PM ET. BBL 4050600053.