Queens · Block 12277 · Lot 1 · 11434

131-10 Guy R Brewer Blvd

12 floors · 111 apartments · 100,752 sq ft · built 1984 · class D3 · owner of record: Northeastern Conference House Housing

22open violations
$12,500ECB/OATH penalties owed
2HPD class C (immediately hazardous)
62dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 100,752 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 427 days
Next cycle year 2027
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 12277). Agency page

Dec 31, 2027
in 427 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $287,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 479 days
No Cycle 10 report on record yet
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-25 (Pre-filing). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3) · $12,500 owed
IssuedViolationHearingBalance
Jul 24, 2025Construction CLASS - 1
FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT A DESIGNATED UNSAFE BUILDING FACADE AS PER TECHNICAL REPORT UNSAFE-1011719-10B-001.NOTES:AT THE TIME OF INSPECTION ON UNSAFE FILING PER QEWI OB
#35694082J
Sep 30, 2025
IN VIOLATION
$10,000
Jun 6, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALLS. AT TIME OF INSPECTION OBSERVED DAMAGED BRICKS AROUND WINDOW AT EXPOSURE#4. AT EXPOSURE#1 OBSERVED DAMAGED BRICKS, CRACKED BRICKS AROUND WINDOW AND A VERTICAL CRACK ON MASONRY
#39150221K
Aug 12, 2025
IN VIOLATION
$2,500
Jun 1, 2021Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #811719.REMEDY:SUBMIT ACCEPTABLE REQUIRED
#37021796H
Dec 21, 2021
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (8)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (11) · C 2 · B 5 · A 4
IssuedClassViolationCorrect by
May 26, 2026AApt 3G · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE BASEBOARD RADIATOR AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTAug 29, 2026
May 26, 2026AApt 3G · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE BASEBOARD RADIATOR AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTAug 29, 2026
May 21, 2025BApt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING. IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 25, 2025
May 21, 2025BApt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE STOPPER AT BATHTUB. IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 25, 2025
May 21, 2025BApt 4A · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 25, 2025
May 21, 2025BApt 4A · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 25, 2025
May 21, 2025BApt 4A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING. IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 25, 2025
Nov 17, 2023CApt 5D · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHNov 16, 2023
Oct 20, 2023CApt 3C · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 20, 2023
Oct 17, 2023AApt 613 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE FOYER LOCATED AT APT 613, 6th STORY, 6th APARTMENT FROM EAST AT SOUTHJan 20, 2024
Oct 17, 2023AApt 613 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE FOYER LOCATED AT APT 613, 6th STORY, 6th APARTMENT FROM EAST AT SOUTHJan 20, 2024

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 8:24 PM ET. BBL 4122770001.

Look up another building