Brooklyn · Block 2682 · Lot 8 · 11222

130 Nassau Avenue

3 floors · 4 apartments · 4,125 sq ft · built 1931 · class S4 · owner of record: Funky Nassau Llc

6open violations
$1,505ECB/OATH penalties owed
0HPD class C (immediately hazardous)
48dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 48 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 48 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 64 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 292 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 779 days
Next cycle year 2028

Open violations

ECB / OATH (4) · $1,505 owed
IssuedViolationHearingBalance
Oct 21, 2026Construction CLASS - 3
ATOI, OBSERVED AT PREMISES ADDRESS, COMMERCIAL SPACE HAS NEWLY INSTALLED STORE SIGN ATTACHED TO FACADE AT EXP. 1 & 2, 100% COMPLETED, WITHOUT ANY PERMITS/ JOB FILINGS AS PER DOB RECORDS., OBTAIN PERMIT OR RESTO
#39208838J
Jan 6, 2027
PENDING
$250
Aug 26, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONERS ORDERS TO OBTAIN A PERMIT FOR VIO# 39182889R. NO PERMITS ON FILE FOR REMOVAL OF VERTICAL SUPPORT COLUMNS AND INSTALLING TEMPORARY SUPPORT JACKS IN BASEMEN
#39201945N
Nov 4, 2026
IN VIOLATION
$625
Apr 1, 2026Construction CLASS - 1
ATOI AT A 3-STORY BUILDING I OBSERVED THE REMOVAL OF VERTICAL SUPPORTING COLUMNS AT BASEMENT AND TEMPORARILY SUPPORTED BY SCREW JACKS AND 4X4 WOOD, NO ONGOING WORK IN PROGRESS AT TIME OF INSPECTION., OBTAIN PER
#39182889R
Jul 9, 2026
IN VIOLATION
$0
Nov 20, 2018Construction CLASS - 2
WORK WITHOUT PERMIT. NOTE: AT EXPOSURE #1 AND 2 AWNING APPROXIMATELY 50 FEET WRAP AROUND BOTH EXPOSURE 4 FEET HIGH 3 FEET DEPTH ANOTHER SIGN ABOVE SIGN ON EXPOSURE 1 SIGN ERECTED APPROXIMATELY 12 FEET
#35369696P
Feb 25, 2019
STIPULATION/IN-VIO
$630
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Oct 28, 2026AEUHAZ FTC-AEU-HAZ
Active
HPD (2) · C 0 · B 2 · A 0
IssuedClassViolationCorrect by
Jul 8, 2008BD26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GYPSUM PLASTER FIRE RETARDANT CEILING IN BOILER ENCLOSURE CELLAR REAR.Aug 12, 2008
Jul 8, 2008BD26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMENT PLASTER CLG CELLAR AT EAST.Aug 12, 2008

Issued in the last 120 days

DateSourceWhatNow
Oct 28, 2026DOB SafetyAEUHAZ: Open
Oct 21, 2026ECBConstruction: ATOI, OBSERVED AT PREMISES ADDRESS, COMMERCIAL SPACE HAS NEWLY INSTALLED STORE SIGN ATTACHED TO FACADE AT EXP. 1 & 2, 100% COMPLETED, WITHOUT ANY PERMITS/ JOB FILINGS AS PER DOB RECORDS., OBTAIN PERMIT OR RESTOOpen
Aug 26, 2026ECBConstruction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONERS ORDERS TO OBTAIN A PERMIT FOR VIO# 39182889R. NO PERMITS ON FILE FOR REMOVAL OF VERTICAL SUPPORT COLUMNS AND INSTALLING TEMPORARY SUPPORT JACKS IN BASEMENOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 13, 2026, 4:45 PM ET. BBL 3026820008.

Look up another building