Queens · Block 11727 · Lot 58 · 11420

130-34 Hawtree Creek Road

1 floors · 1,606 sq ft · built 2011 · class M1 · owner of record: Bethany House Of Worship Inc.

2open violations
$520ECB/OATH penalties owed
0HPD class C (immediately hazardous)
775dto Gas piping inspection (2028 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 775 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $520 owed
IssuedViolationHearingBalance
Aug 4, 2026Construction CLASS - 3
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. SIDEWALK CURB AT LEFT SIDE OF PROPERTY EXP.1 APPROX. 8FT. PORTION OF SIDEWALK CURB IS LOWERED ENABLING A VEHICLE TO DRIVE ONTO SIDEWALK TO LEFT SIDE OF P
#39199067Z
Oct 13, 2026
IN VIOLATION
$520
DOB (1)
IssuedViolationStatus
Mar 27, 2003UNSAFE BUILDINGS

#4026/03
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 4, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. SIDEWALK CURB AT LEFT SIDE OF PROPERTY EXP.1 APPROX. 8FT. PORTION OF SIDEWALK CURB IS LOWERED ENABLING A VEHICLE TO DRIVE ONTO SIDEWALK TO LEFT SIDE OF POpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 4:05 PM ET. BBL 4117270058.

Look up another building