2 floors · 2 apartments · 3,440 sq ft · built 1946 · class K4 · owner of record: George E Francis
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 429 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 2, 2016 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES.(EXTERIOR)NOTED: AT THE TIME OF INSPECTION OBSERVED AT EXP#2 VERTICAL & HORIZONTAL STEP CRACK SPANNING FROM BASE OF THE BRICK FACADE BLDG INTO THE PARAPET W/MISSI #35194831R | Jan 24, 2017 IN VIOLATION | $0 |
| Jun 6, 2008 | Quality of Life Non-Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY THE BUILDING DEPT RECORDS. ILLEGAL OCCUPANCY NOTED: CELLAR IS USED IN CONJUNCTION WITH 1ST FLOOR DAY CARE (FRANCIS GRACE DAY CARE) AND TWO 2 PIECE BATHROOM. CELLAR DAY CARE #34654207L | May 12, 2009 IN VIOLATION | $0 |
| Jun 6, 2008 | Quality of Life Non-Hazardous WORK WITHOUT A PERMIT. WORK NOTED: AT CELLAR LEVEL INSTALLED WATER AND WASTE LINES FOR TWO @ PIECE BATHROOM ( 2 TOILETS & 2 SINKS) REM: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION. #34654208N | Jul 29, 2008 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 11:31 AM ET. BBL 4125410058.