1 floors · 64,000 sq ft · built 1974 · class E1 · owner of record: Robert Bialer, As Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4206). Agency page | Dec 31, 2026 in 51 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 64,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1147 days | Next cycle year 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Apr 13, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG SUSTAIND EXTENSVE FIRE DMG W/APPR 60% ROOF CLLPSPD,INADEQUATELY BRACD EXT WALLS,&PRTLLY DTACHD CNCRTE WALL PANELS@EXP2,3,&4.THE BLDG IS STRCTRLLY CMPRMSD,@ RISK OF FRTHR CLLPSE OWNR TO IMMED RTAIN DOB REG GC TO INSTLL TGHTBRD CONSTRUCTN FENCE MINIMUM 30'FRM THE BLDG,SBM #FEU40701KR | DOB VIOLATION - ACTIVE |
| Apr 13, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG SUSTAIND EXTENSIVE FIRE DMG W/APPROX 60% ROOF CLLPSD,INADEQUATELY BRACD EXT WALLS,&PRTLLY DTACHD CONCRETE WALL PANELA@EXP2,3,&4.THE BLDG IS STRCTRLLY CMPRMSD@RISK.OWNR TO IMMED RTAIN NYSPE&DEMO ENDRSD CNTRCTR TO IMMED FULLY DEMO THE BLDG&GRADE& FENCE SITE.ALL WRK TO BE #FEU40702KR | DOB VIOLATION - ACTIVE |
| Apr 11, 2026 | CONSTRUCTION SRRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION RESPONDING TO A N INCIDENT OBSERVED A I STORY COMMERCIAL BUILDING DAMAGED DUE TO FIRE ROOF HAS CLLAPSED LEAVIND BUILDING EXPOSED TO ALL ELEMENTS. BUILDING H AS SUSTAINED EXCESSIVE EATER ANSD SMOKE DAMAGES. VACATE ENTIRE BUILDIN G #CER02CM | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 9:14 AM ET. BBL 4042060001.