Manhattan · Block 298 · Lot 26 · 10002

13 Ludlow Street

5 floors · 17 apartments · 10,179 sq ft · built 1900 · class C7 · owner of record: 13-15 Ludlow Street Llc

23open violations
$875ECB/OATH penalties owed
2HPD class C (immediately hazardous)
62dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-09-24 (Accepted). Agency page

Dec 31, 2026
in 62 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 793 days
Next cycle year 2028

Open violations

ECB / OATH (2) · $875 owed
IssuedViolationHearingBalance
Jan 29, 2025Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39080851Y ISSUED ON 03/07/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT
#37032825L
Jun 5, 2025
IN VIOLATION
$625
Mar 7, 2023Construction CLASS - 3
FAILURE TO MAINTAIN. OBSERVED WINDOW A/C UNITS ON THE 2ND AND 3RDMFLOORS, MISSING SUPPORT BRACKETS, REPAIR AND OR REPLACE; REPAIR/REPLACE
#39080851Y
May 11, 2023
STIPULATION/IN-VIO
$250
DOB (6)
IssuedViolationStatus
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#20293
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#40071
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#01314
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#02044
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#01481
DOB VIOLATION - ACTIVE
Jan 19, 2007LOCAL LAW 62/91 - BOILERS

#02301
DOB VIOLATION - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 3)
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Jan 19, 2007Boiler LL6291
Active
HPD (8) · C 2 · B 0 · A 6
IssuedClassViolationCorrect by
May 13, 2024CApt 9 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 9, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHMay 19, 2024
Jun 7, 2022A§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE EAST FACADE AT CORNICE, 5th STORYSep 10, 2022
Jun 7, 2022A§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONETS AT ALL BALCONIES AT ALL STORIES AT EAST AT 1st FIRE ESCAPE FROM NORTHSep 10, 2022
Mar 16, 2022AApt 1 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED FROM FLOOR TO CEILING DIVIDING 1 ROOM INTO 2 IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 3rd STORY, 2nd APARTMENT FROM WEST ATJun 19, 2022
Jun 4, 2008C§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING PANES OF GLASS AT VESTIBULE DOOR 1 STY R 194.Jun 10, 2008
Jun 4, 2008AD26-10.01 ADM CODE PROVIDE APPROVED FIRE PROOF SELF CLOSING DOOR WITH KEY OPERATED DEAD BOLT & LATCH SET PEEP HOLE & CHAIN DOOR GUARD AT ENTRANCE TO 5TH STY ALL APTS.Sep 7, 2008
Jun 4, 2008AD26-10.01 ADM CODE PROVIDE APPROVED FIRE PROOF SELF CLOSING DOOR WITH KEY OPERATED DEAD BOLT & LATCH SET PEEP HOLE & CHAIN DOOR GUARD AT ENTRANCE TO 4TH STY ALL APTS.Sep 7, 2008
Jun 4, 2008AApt 5 · § 213, SUBD. 5 M/D LAW DISCONTINUE USE OF INTERIOR ROOM FOR LIVING OR PROVIDE A SINGLE OPENING OF AT LEAST 60 PERCENT OF AREA OF THE PARTITION TO ROOM HAVING WINDOW OPENING DIRECTLY TO STREET OR YARD 4 STY FRONT NORTH APT 5 2 RM FROM FRONT AT NORTH & SOUTH. LOCATED AT APT 5Sep 7, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 12:35 AM ET. BBL 1002980026.

Look up another building