Brooklyn · Block 3243 · Lot 32 · 11221

1298 Dekalb Avenue

4 floors · 20 apartments · 14,800 sq ft · built 1931 · class C1 · owner of record: 1298 Dekalb Residence Llc

16open violations
$0ECB/OATH penalties owed
4HPD class C (immediately hazardous)
50dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 50 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-11 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#35635
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (15) · C 4 · B 2 · A 9
IssuedClassViolationCorrect by
May 27, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AT VESTIBULEJun 10, 2025
May 3, 2023BApt 5 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT BUILDING FRONT IN THE ENTRANCE LOCATED AT APT 5, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 7, 2023
Feb 21, 2014CApt 15 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 15, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHFeb 20, 2014
Mar 11, 2010AApt 15 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION , INSTALLATION OF SUSPENDED CEILING IN THE BATHROOM LOCATED AT APT 15, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHJun 14, 2010
Mar 11, 2010AApt 15 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION , INSTALLATION OF SUSPENDED CEILING THROUGH OUT THE ENTIRE APARTMENT LOCATED AT APT 15, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHJun 14, 2010
Jul 23, 2007A§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION 3 WOODEN STRUCTURES ON ROOFOct 26, 2007
Jul 23, 2007A§ 12 M/D LAW DISCONTINUE THE UNLAWFUL KEEPING OF PIGEONS ON ROOFOct 26, 2007
Nov 3, 2004AApt 15 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 15, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTFeb 11, 2005
Nov 3, 2004AApt 15 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING. IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 15, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTFeb 11, 2005
Nov 3, 2004AApt 15 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE BATHROOM LOCATED AT APT 15, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTFeb 11, 2005
Nov 3, 2004AApt 15 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 15, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTFeb 11, 2005
Jul 7, 2004AApt 15 · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROPPED CEILING 4 STY SOUTHEAST APT 15 THRU OUT. , SECTION '' ''Oct 15, 2004
May 18, 2004BApt 9 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CONCRETE FLOOR IN THE BATHROOM LOCATED AT APT 9, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJun 27, 2004
Nov 10, 1987CApt 15 · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WINDOW SILL 4 STY APT 15 EAST REAR ROOM PACHECO 443 0199. LOCATED AT APT 15Nov 30, 1987
Nov 10, 1987CApt 15 · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILINGS 4 STY EAST APT 15 THRU OUT PACHECO 443 0199. LOCATED AT APT 15Nov 30, 1987

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 5:45 AM ET. BBL 3032430032.

Look up another building