Brooklyn · Block 788 · Lot 25 · 11232

129 51 Street

2 floors · 46,960 sq ft · built 1931 · class E1 · owner of record: 129-155 51st Streetrealty

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
189dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 46,960 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1164 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-19 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jun 3, 2010Construction CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C/O OR BLDG DEPT RECORDS. NOTED C/O #210330 STATES 2ND FLR OCCUPANCY AS USE GROUP 16 LOCKER ROOMS.NOW BEING USED AS USE GROUP 6 OFFICE SPACE ENTIRE SEPARATE FROM NEW
#34849115Y
Jul 26, 2010
STIPULATION/IN-VIO
$0
DOB (3)
IssuedViolationStatus
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2002948
DOB VIOLATION - ACTIVE
Jan 17, 2017CONSTRUCTION

#CN0702RA
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#28533
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Apr 29, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 10:40 PM ET. BBL 3007880025.

Look up another building