Bronx · Block 2766 · Lot 1 · 10474

1280 Spofford Avenue

5 floors · 45,200 sq ft · built 1915 · class W1 · owner of record: Nyc Department Of Education

17open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
179dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 45,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 179 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 179 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1154 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-09 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5)
IssuedViolationHearingBalance
Jul 21, 2026Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING. NOTED: AT (BASEMENT)EXIT 3 DOORS IN DISREPAIR/NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOOR.
#35736101Z
Aug 14, 2026
POP/IN-VIO
$0
Jul 21, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (BASEMENT)EXIT 3, GAS METERS/BOILER AREAS WITH WATER DAMAGE/PENETRATION TO WALLS/FLOORS WITH SPALLING OF PLASTER/PAINT/MORTAR. REMEDY: REPAIR AND
#35736100R
Aug 14, 2026
POP/IN-VIO
$0
Jul 21, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. NOTED: AT (3RD FL)LIBRARY NOT INSTALLED/PROVIDED WITHOUT
#35734798Z
Aug 14, 2026
POP/IN-VIO
$0
Jul 21, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (4TH FL)STAIR F (1ST FL)AUDITORIUM DOORS ARE IN DISREPAIR/RACKED WHEN TESTED. REMEDY: REPAIR AND/OR REPLACE.
#35734795N
Aug 14, 2026
POP/IN-VIO
$0
Jul 21, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT (1ST FL)BOTH/GYM'S (BASEMENT)CAFETERIA EMERGENCY LIGHTS NOT W
#35734799K
Aug 14, 2026
POP/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#06063
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#06062
DOB VIOLATION - ACTIVE
DOB NOW Safety (10)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 21, 2026ECBConstruction: EXIT DOOR NOT SELF-CLOSING. NOTED: AT (BASEMENT)EXIT 3 DOORS IN DISREPAIR/NOT CLOSING WHEN TESTED. REMEDY: REPAIR/REPLACE DOOR.Open
Jul 21, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (BASEMENT)EXIT 3, GAS METERS/BOILER AREAS WITH WATER DAMAGE/PENETRATION TO WALLS/FLOORS WITH SPALLING OF PLASTER/PAINT/MORTAR. REMEDY: REPAIR ANDOpen
Jul 21, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. NOTED: AT (3RD FL)LIBRARY NOT INSTALLED/PROVIDED WITHOUTOpen
Jul 21, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT (4TH FL)STAIR F (1ST FL)AUDITORIUM DOORS ARE IN DISREPAIR/RACKED WHEN TESTED. REMEDY: REPAIR AND/OR REPLACE.Open
Jul 21, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT (1ST FL)BOTH/GYM'S (BASEMENT)CAFETERIA EMERGENCY LIGHTS NOT WOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 10:57 PM ET. BBL 2027660001.

Look up another building