| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2026 | Construction CLASS - 2 OBSERVED AT TIME OF INSPECTION IN THE BASEMENT: NEW WATER HEATER INSTALLED AND KITCHEN/ BATHROOM PLUMBING AND GAS FIXTURES CAPPED AND REMOVED (WORK WAS 100% COMPLETE; PERMIT B01326985 WAS WITHDRAWN, WORK SHOULD #39205242P | Dec 2, 2026 PENDING | $1,250 |
| Sep 23, 2026 | Construction CLASS - 2 OBSERVED IN BASEMENT AT TIME OF INSPECTION: FUTURE GAS PIPING OUTLET IS CAPPED WITHOUT A VALVE. AS PER FGC 404.15 (OUTLETS MUST BE VALVED AND CAPPED GAS TIGHT) & FGC 409.5.1 (FUTURE APPLIANCE CONNECTIONS REQUIR #39205642Y | Dec 2, 2026 PENDING | $1,250 |
| Oct 17, 2006 | Quality of Life Non-Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O #B300529596. DATED 10,1996 & SIGNED-OFF. NOTED FROM LEVEL ACCESSORY/ ORDINARY USE AT CELLARLEVEL FOR SAID PREMISES TO ILLEGAL CLASS A APT W/ OPEN KITCHEN (GAS #34542634J | Dec 4, 2006 IN VIOLATION | $0 |
| Oct 17, 2006 | Quality of Life Non-Hazardous WORK W/O A PERMIT- WORK NOTED PARTITIONS ERECTED CREATING BEDRMS, LIVING SPACE W/ KITCHEN (W/ GAS STOVE, SINK, REFRIGERATOR, & 3PC BATHRM (W/ VANITY, WATER CLOSET, SHOWER) AT CELLAR LEVEL FOR SAID PREMISES. #34542635L | Dec 4, 2006 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 3, 2009 | B | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS. AT FRONT AREAWAY | Oct 8, 2009 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | ECB | Construction: OBSERVED AT TIME OF INSPECTION IN THE BASEMENT: NEW WATER HEATER INSTALLED AND KITCHEN/ BATHROOM PLUMBING AND GAS FIXTURES CAPPED AND REMOVED (WORK WAS 100% COMPLETE; PERMIT B01326985 WAS WITHDRAWN, WORK SHOULD | Open |
| Sep 23, 2026 | ECB | Construction: OBSERVED IN BASEMENT AT TIME OF INSPECTION: FUTURE GAS PIPING OUTLET IS CAPPED WITHOUT A VALVE. AS PER FGC 404.15 (OUTLETS MUST BE VALVED AND CAPPED GAS TIGHT) & FGC 409.5.1 (FUTURE APPLIANCE CONNECTIONS REQUIR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 10:48 AM ET. BBL 3061290026.