5 floors · 40 apartments · 32,580 sq ft · built 1925 · class C7 · owner of record: New 1275 Lafayette
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-18 (Accepted). Agency page | Dec 31, 2026 in 63 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 32,580 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 307 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 21, 2026 | Construction CLASS - 1 NOTED AT TIME OF INSPECTION OBSERVED MULTIPLE CRACKS OVER DOORWAYS AND CELLING OF APARTMENT 3E IN LIVING ROOM AREA AND KITCHEN AREA, REPAIR AND/REPLACE #39204925J | Dec 4, 2026 PENDING | $2,500 |
| Oct 20, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT APARTMENT 2H MINOR CRACKS OVER DOORWAYS AND CEILINGS, WINDOWS. ALSO SLOPPING FLOORS., REPAIR AND/OR REPLACE #39127925N | Jan 3, 2025 STIPULATION/IN-VIO | $315 |
| Mar 5, 2021 | Boilers CLASS - 2 FOUND BOILER DRAIN IN REAR OF BOILER IS LEAKING. NEED AIR GAP AND DISCHARGE PIPE FOR BACK FLOW PREVENTER. #39037170P | Apr 30, 2021 DEFAULT | $3,125 |
| Dec 28, 2019 | Construction CLASS - 2 WORK W/O A PERMIT:AT TIME OF INSPECTION,OBSERVED 4 CONDENSERS AT EXP 2WALL INSTALLED. AND WIRED PROTRUDING AT SAID WALL INTO BUILDING. AS PER DOB RECORDS,NO PERMITS ON FILE FOR THIS SCOPE OF ELECTRICAL WORK. RE #35432207Y | Feb 21, 2020 DEFAULT | $6,825 |
| Dec 28, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BLD IN A CODE COMPLIANT MANNER-AT TIME OF INSPECTION,OBSERVE EXHAUST FAN AT EXP 2 APPROX 1' FROM FIRE ESCAPE DROP LADDER. AND APPROX 1' FROM 1ST FL BEDROOM WINDOW. THIS CONDITION IS NON COMP #35432208X | Feb 21, 2020 DEFAULT | $3,125 |
| Apr 29, 2018 | Construction CLASS - 2 WORK W/OUT A PERMIT NOTED:ADVERTISING BUSINESS SIGN ATTACHED TO THE BLDG W/OUT A PERMIT.1-SIGN READS DELI GROCERY SIZE 2.5 X 44' FT APPROX 2-SIGN READS BOOST (MOBLIE) SIZE 3 BY 20 FT APPROX 3-DE CACHE BARBERSHO #35329074Y | Jun 15, 2018 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01289 | DOB VIOLATION - ACTIVE |
| Mar 11, 2019 | CONSTRUCTION #CN0202FK | DOB VIOLATION - ACTIVE |
| Mar 11, 2019 | CONSTRUCTION #CN022FK | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 28, 2026 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Nov 2, 2026 |
| Sep 28, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Oct 22, 2026 |
| Sep 28, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Oct 22, 2026 |
| Sep 28, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM | Oct 22, 2026 |
| Sep 28, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Oct 22, 2026 |
| Sep 28, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL, BASEBOARD AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WE | Jan 1, 2027 |
| Sep 28, 2026 | C | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Oct 4, 2026 |
| Sep 28, 2026 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Nov 2, 2026 |
| Sep 28, 2026 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Nov 2, 2026 |
| Sep 28, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM WEST AT NORTH WALL, BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, BASEBOARD AT NORTH WALL, BASEBOARD | Jan 1, 2027 |
| Sep 28, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, | Oct 22, 2026 |
| Sep 28, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Jan 1, 2027 |
| Sep 28, 2026 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEILING, SOUTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Nov 2, 2026 |
| Sep 28, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Jan 1, 2027 |
| Sep 28, 2026 | C | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Oct 4, 2026 |
| Aug 25, 2026 | C | Apt 3E · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Sep 18, 2026 |
| Aug 24, 2026 | A | Apt 3E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 1ST WINDOW FRAME ( JAMB) FROM NORTH AT EAST IN THE 2nd ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Nov 27, 2026 |
| Aug 24, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR, EAST WALL IN THE FOYER LOCATED AT APT 3E, 3rd | Sep 17, 2026 |
| Aug 24, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3E, 3rd STORY, | Sep 17, 2026 |
| Aug 24, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Sep 17, 2026 |
| Aug 24, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, NORTH WALL, SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT A | Sep 17, 2026 |
| Aug 24, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Sep 17, 2026 |
| Aug 24, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATE | Sep 17, 2026 |
| Aug 24, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Sep 17, 2026 |
| Aug 24, 2026 | C | Apt 3E · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR, NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT | Sep 17, 2026 |
| Aug 24, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Nov 27, 2026 |
| Aug 24, 2026 | B | Apt 3E · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SEC | Sep 28, 2026 |
| Aug 24, 2026 | B | Apt 3E · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTI | Sep 28, 2026 |
| Aug 24, 2026 | B | Apt 3E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCE AT 1ST WINDOW FROM SOUTH AT WEST IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Sep 28, 2026 |
| Aug 24, 2026 | A | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Nov 27, 2026 |
| Aug 24, 2026 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Sep 28, 2026 |
| Aug 24, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Nov 27, 2026 |
| Aug 24, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Nov 27, 2026 |
| Aug 24, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT SOUTH WALL, BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, WEST WALL, NORTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NO | Nov 27, 2026 |
| Aug 24, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Nov 27, 2026 |
| Aug 24, 2026 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Sep 28, 2026 |
| Aug 24, 2026 | B | Apt 3E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ.FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Sep 28, 2026 |
| Aug 24, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Nov 27, 2026 |
| Aug 24, 2026 | C | Apt 3E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Sep 19, 2026 |
| Aug 24, 2026 | B | Apt 3E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT 1ST WINDOW ( FIRE ESCAPE) FROM SOUTH AT WEST IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Sep 28, 2026 |
| Aug 24, 2026 | B | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Sep 28, 2026 |
| Jul 7, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST | Oct 10, 2026 |
| Jul 7, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST | Oct 10, 2026 |
| Jul 7, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST | Oct 10, 2026 |
| Jul 2, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Oct 5, 2026 |
| Jan 15, 2026 | A | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 20, 2026 |
| Jan 15, 2026 | A | Apt 3E · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT TILED/GROUTED SURFACES AT NORTH WALL, EAST WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 20, 2026 |
| Jan 15, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 20, 2026 |
| Jan 15, 2026 | A | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 20, 2026 |
| Jan 15, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH, THE 1st ROOM FROM NORTH AT WEST, THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT | Apr 20, 2026 |
| Jan 15, 2026 | A | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 20, 2026 |
| Jan 15, 2026 | A | Apt 3E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM NORTH AT EAST | Apr 20, 2026 |
| Jan 13, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 18, 2026 |
| Jan 13, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 18, 2026 |
| Jan 13, 2026 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 18, 2026 |
| Nov 26, 2025 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FRAME FROM NORTH AT EAST WALL, CEILING, 1st DOOR FRAME FROM NORTH AT EAST WALL, CEILING, 1st DOOR FRAME FROM NORTH AT EAST WALL, CEILING, 1st DOOR FRAME FROM NORTH AT EAST WALL, CEILING, 1st DOOR FRA | Mar 1, 2026 |
| Nov 26, 2025 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, CEILING, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 1, 2026 |
| Nov 26, 2025 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 1, 2026 |
| Nov 26, 2025 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 1, 2026 |
| Nov 26, 2025 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, CEILING, CEILING IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 1, 2026 |
Showing 60 of 124. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 28, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Open |
| Sep 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Sep 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Sep 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM | Open |
| Sep 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Sep 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL, BASEBOARD AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WE | Open |
| Sep 28, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Open |
| Sep 28, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Open |
| Sep 28, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Open |
| Sep 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM WEST AT NORTH WALL, BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, BASEBOARD AT NORTH WALL, BASEBOARD | Open |
| Sep 28, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3E, 3rd STORY, | Open |
| Sep 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Open |
| Sep 28, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEILING, SOUTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Open |
| Sep 28, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Open |
| Sep 28, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''East'' | Open |
| Sep 21, 2026 | ECB | Construction: NOTED AT TIME OF INSPECTION OBSERVED MULTIPLE CRACKS OVER DOORWAYS AND CELLING OF APARTMENT 3E IN LIVING ROOM AREA AND KITCHEN AREA, REPAIR AND/REPLACE | Open |
| Aug 25, 2026 | HPD C | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Open |
| Aug 24, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE 1ST WINDOW FRAME ( JAMB) FROM NORTH AT EAST IN THE 2nd ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' | Open |
| Aug 24, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR, EAST WALL IN THE FOYER LOCATED AT APT 3E, 3rd | Open |
| Aug 24, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3E, 3rd STORY, | Open |
| Aug 24, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Aug 24, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, NORTH WALL, SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT A | Open |
| Aug 24, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
| Aug 24, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATE | Open |
| Aug 24, 2026 | HPD C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES S | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 3:18 PM ET. BBL 2027400039.