3 floors · 7,556 sq ft · built 2004 · class N9 · owner of record: Odyssey House, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-10-02 (Accepted). Agency page | Dec 31, 2026 in 60 days | 2 of 2 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 1, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED SHORING INSTALLED ON ALL LEVELS OF BUILDING. UPON REQUESTING DRAWINGS FOR SHORING NOTICE A SET OF SHORING ARE NOT REFLECTED ON DRAWINGS. CS SAID IT WAS FOR A CHANGE ORDER BUT NO #39560048H | Dec 18, 2026 PENDING | $1,250 |
| Oct 1, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION OBSERVED WORKER MAKE MODIFICATION (HOLES) TO STRUCTURAL STEEL BEAM TO FACILITATED ERECTION. UPON REQUESTING SHOP DRAWINGS OR ENGINEERS LETTER APPROVING ON SITE MODIFICATION CS COULD NOT PR #39560049J | Dec 18, 2026 PENDING | $5,000 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 1989 | UNSAFE BUILDINGS #15-89(SFNP) | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Oct 1, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED SHORING INSTALLED ON ALL LEVELS OF BUILDING. UPON REQUESTING DRAWINGS FOR SHORING NOTICE A SET OF SHORING ARE NOT REFLECTED ON DRAWINGS. CS SAID IT WAS FOR A CHANGE ORDER BUT NO | Open |
| Oct 1, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED WORKER MAKE MODIFICATION (HOLES) TO STRUCTURAL STEEL BEAM TO FACILITATED ERECTION. UPON REQUESTING SHOP DRAWINGS OR ENGINEERS LETTER APPROVING ON SITE MODIFICATION CS COULD NOT PR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 7:12 PM ET. BBL 2027630077.