Queens · Block 1833 · Lot 165 · 11368

126-94 Willets Point Blvd

1 floors · 2,300 sq ft · built 1930 · class G1 · owner of record: 126 Willet Llc

7open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1166dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1166 days
Next cycle year 2029

Open violations

ECB / OATH (6) · $3,750 owed
IssuedViolationHearingBalance
Aug 5, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39160834M, FILE A CERTIFICATE OF CORRECTION
#39199190Y
Oct 13, 2026
IN VIOLATION
$1,250
Aug 5, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIOLATION 39160827Y, COMPLY WITH COMMISSIONER'S ORDER
#39199189R
Oct 13, 2026
IN VIOLATION
$2,500
Sep 17, 2025Unknown CLASS - 2
OBSERVED REMOVED ALL THE EXISTING ELECTRICAL WIRINGS THROUGHOUT THE BUILDING. NO ELECTRICAL PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN PERMIT
#39160828X
Nov 25, 2025
IN VIOLATION
$0
Sep 17, 2025Construction CLASS - 2
AT FRONT REMOVED THE EXISTING ROLL DOWN SHUTTER. INSTALLED NEW SHUTTER APPROXIMATELY 20' X 30'. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN ALL PERMITS
#39160829H
Nov 25, 2025
IN VIOLATION
$0
Sep 17, 2025Construction CLASS - 1
OBSERVED ALL THE BRICK WALLS AT EXISTING BUILDING STRUCTURE HAVE BEEN DEMOLISHED. NO DEMOLITION PERMITS FOR THIS SCOPE OF WORK AT THE TIME OF INSPECTION., OBTAIN REQUIRED DEMOLITION PERMIT
#39160827Y
Nov 25, 2025
IN VIOLATION
$0
Sep 17, 2025Construction CLASS - 1
OBSERVED CONSTRUCTION DEBRIS SCATTERED ALL OVER INSIDE THE DEMOLISHED BUILDING AND IN FRONT OF THE BUILDING AT EXPOSURE #1., REPAIR AND/REPLACE
#39160834M
Nov 25, 2025
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Aug 5, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS 39160834M, FILE A CERTIFICATE OF CORRECTIONOpen
Aug 5, 2026ECBConstruction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIOLATION 39160827Y, COMPLY WITH COMMISSIONER'S ORDEROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 1:23 AM ET. BBL 4018330165.

Look up another building