3 floors · 52,065 sq ft · built 1928 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 52,065 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 163 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 163 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 407 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 12104). Agency page | Dec 31, 2034 in 2964 days | Next due 2034 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-20 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 26, 2026 | Construction CLASS - 2 REISSUE ON ECB#35725401R FAILURE TO MAINTIAN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY EXIT DISCHARGES AND EXIT SIGNS WER #35733099P | Jul 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATEDCLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINDING,MISSING ANDOR FAULTY HARDWARE ON CLASSROOMS 213,216,204,206,207,108,102,103 OBSER #35733051X | Jul 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT EXIT 6 WIRE MESH GLASS PANELS ARE CRACKED ON 2 DIFFERENT LOCATIONS WITH A TOTAL OF 4 PANELS IN TOTAL OBSERVED UPON INSPECTION.REM:REPAIR AND/OR REP #35733054L | Jul 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 REISSUE ON ECB#35725400P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 1ST FLOOR AUDITORIUM EXIT AT STAIRWAY F CEILING IN VESTIBULE IS IN DISREPAIR DUE TO SPALLING PLASTER IN VARIOUS LOCATIONS #35733050Y | Jul 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NO FIRE STOPPINGPER BC 712.3;27-345.NOTED:MISSING FIRE STOPPING IN ELECTRICAL SWITCH GEAR ROOM WALLS AT VARIOUS POINTS THROUGOUT OBSERVED UPON INSPECTION.RE #35733053J | Jul 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:IN CAFETERIA HAS LIVE ELECTRIC CORD PLUGGED IN TO AN OUTLET RUNNING THROUGH 1ST FL CAFETERIA SMOKE DOORS INTO VESTIBULE PINCHING THE WIRE ON METAL DOO #35733052H | Jul 15, 2026 POP/IN-VIO | $0 |
| Sep 26, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITSM EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INPECTION OBSERVED AND NOTED AT 2ND. FLOOR AT GYM 6 PLAC #35725401R | Oct 23, 2025 POP/IN-VIO | $0 |
| Sep 26, 2025 | Construction CLASS - 2 REISSUE: 35655440Z DATE OF ISSUE: 06-09-2022. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 1ST FLOOR AUDITORIUM EXIT STAIRWAY 'F' CEILING IN VESTIBULE I #35725400P | Oct 23, 2025 POP/IN-VIO | $0 |
| Jun 28, 2024 | Construction CLASS - 2 REISSUE #35655440Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 1ST FL AUDITORIUM EXIT #10/STAIR F. CEILING SPALLING PLASTER IN VARIOUS LOCATIONS AND A HOLE IN CEILING APPROX 3SQFT. INTERIOR #35682887Z | Aug 19, 2024 POP/IN-VIO | $0 |
| Jun 28, 2024 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED EXTERIOR DOORS AT EXITS #3, 10, 4 AND 2, NOT SELF-CLOSING PROPERLY DUE TO RUBBING ON FRAME OR SADDLE AND DEFECTIVE HARDWARE. REMEDY: REPAIR/REPLACE DOORS. #35682886R | Aug 19, 2024 POP/IN-VIO | $0 |
| Jun 9, 2022 | Construction CLASS - 2 RE-ISSUE #35561033Y FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:NOTED:OBSERVED AT 1ST FLOOR AUDITORIUM(EXIT)STAIRWAY "F" CEILING IN VESTIBLUE IN STATE OF DISREPAIR DUE TO SPALLING PLASTER IN VARIOUS L #35655440Z | Oct 25, 2022 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 5:48 AM ET. BBL 4121040001.