| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 26,205 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 22, 2026 | Unknown CLASS - 2 AT TIME OF MY INSPECTION 1-STORY NB AT FOUNDATION PHASE, BUILDING APPROX. 14980 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALER #39555738Z | Apr 6, 2027 PENDING | $2,500 |
| Feb 18, 2026 | Unknown CLASS - 2 3303.4.1.1- OBSERVED JOBSITE WITH LARGE AMOUNT OF SNOW AND ICE ACCUMULATED ON EXTERIOR OF JOBSITE ON PUBLIC WALK WAY @ EXPOSURES 1&2. THE WALK WAY DISRUPTS THE EGRESS OF PEDESTRIANS AND DOES NOT GRANT AT LEAST5 #39550468P | Sep 11, 2026 IN VIOLATION | $2,500 |
| May 24, 2025 | Unknown CLASS - 2 3303.3 WATCHPERSON.AT TIME OF MY INSPECTION 1STORY NB AT FOUNDATION,BUILDING APPROX14980 SQUARE FT.SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY.UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO #39540612L | Nov 6, 2026 DEFAULT | $10,000 |
| Mar 18, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED JOB SITE FENCE NOT ERECTED OR MAINTAINED AS PER CODE. FENCE AT EXPOSURE #1 IS APPROXIMATELY 12 - 15'FT TALL, MADE OF CORRUGATED SHEET METAL WITHOUT VIEWING PANELS, GATE/DOOR SWING #39514300N | Aug 2, 2024 IN VIOLATION | $1,000 |
| Mar 18, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED 20FT DEEP EXCAVATION WITHOUT ADEQUATE/SAFE EGRESS, NO CLEAR PATH, LADDER, STAIRS OR EARTH RAMP AND ARE FORCED TO WALK/CLIMB UP THE STEEP UNGRADED EXCAVATION WITH ROCKS AND MATERIA #39514299P | Aug 2, 2024 IN VIOLATION | $2,500 |
| Mar 18, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED 20FT DEEP EXCAVATION CONTRARY TO THE APPROVED PLAN WHICH ONLY SHOWS A DEPTH OF 5FT. THE WORK BEING PERFORMED CONTRARY TO THE APPROVED PLAN DAMAGED THE ADJ PROPERTIES AND PUT ADJ P #39514298N | Aug 2, 2024 IN VIOLATION | $12,500 |
| Mar 18, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED 20FT DEEP EXCAVATION WITHOUT A TR1 ON FILE. THE RESPONDENT STARTED WORK PRIOR TO FILING A SPECIAL INSPECTOR STATEMENT OF RESPONSIBILITY/TR1 AS REQUIREDFILE TR1 #39514301P | Aug 2, 2024 IN VIOLATION | $2,500 |
| Mar 18, 2023 | Site Safety CLASS - 1 AT TIME OF INSPECTION IT WAS OBSERVED THAT THE CONSTRUCTION SUPER FAILED TO PERFORM DUTIES. 20FT DEEP EXCAVATION OBSERVED WITHOUT SHORING, MONITORING, WORK NONCONFORMING, NO TR1, DAMAGED ADJ PROPERTY, FAILURE T #39514302R | Aug 2, 2024 IN VIOLATION | $15,677 |
| Mar 18, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED 20FT DEEP EXCAVATION WITH SHEAR CUTS AND NO GUARDRAILS AT ANY REQUIRED LOCATIONS PROVIDE GUARDRAILS #39514297L | Aug 2, 2024 IN VIOLATION | $1,425 |
| Issued | Violation | Status |
|---|---|---|
| Mar 22, 2023 | CONSTRUCTION #E20201JT | DOB VIOLATION - ACTIVE |
| Mar 20, 2023 | CONSTRUCTION #E20201JT | DOB VIOLATION - ACTIVE |
| Mar 20, 2023 | CONSTRUCTION #E20202JT | DOB VIOLATION - ACTIVE |
| Mar 18, 2023 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT DUE TO EXCAVATION ABOUT 20' WITH A SHEER CUT ALONG EXPOSURE #2,#3 AND #4 #23-00734 | DOB VIOLATION - ACTIVE |
| Mar 18, 2023 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT DUE TO EXCAVATION AT 1250 OAK POINT AVENUE EXCAVATION IS APPROXIMATELY 20' IN DEPT COMPROMISING INTEGRITY OF PREMISES. #23-00735 | DOB VIOLATION - ACTIVE |
| Mar 18, 2023 | CONSTRUCTION #E0201WD | DOB VIOLATION - ACTIVE |
None open.