Brooklyn · Block 2885 · Lot 1 · 11211

125 Maspeth Avenue

18 floors · 311 apartments · 260,640 sq ft · built 2025 · class D6 · owner of record: Maspeth Park Housing Development Fund Co Rporation

89open violations
$36,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual boiler inspection (9 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-16 (Accepted). Agency page

Dec 31, 2026
in 65 days
8 of 9 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $996,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 117 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 260,640 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 186 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 186 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 796 days
Next cycle year 2028
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2885). Agency page

Dec 31, 2035
in 3352 days
Next due 2035

Open violations

ECB / OATH (53) · $36,250 owed
IssuedViolationHearingBalance
Jul 28, 2026Construction CLASS - 2
MONORAIL SUSPENDED SCAFFOLD SYSTEM INSTALLED CONTRARY TO PLANS-ATTACHMENT OF BEAMS TO CONCRETE SLAB-USING CHOKE/SLING LINES-AS PER PLAN 5/16" WIRE ROPE WITH J-BOLTS AT TOP AND BOTTOM ,TIMBLE,SHACKLE TO BE USED,
#39557629Z
Oct 14, 2026
IN VIOLATION
$1,250
Jul 28, 2026Construction CLASS - 2
AT THE TIME OF MY INSPECTION -OBSERVED OUTRIGGER BEAM SUSPENDED SCAFFOLD INSTALLED AT EXP#2(ROOF) WITH TIEBACK INSTALLED TO ANGLE ANCHORAGE SYSTEM ON CONCRETE WALL-NO PULL TEST PERFORMED/PROVIDED AS REQUIRED-ST
#39557631H
Oct 14, 2026
IN VIOLATION
$1,250
Jul 28, 2026Cranes and Derricks CLASS - 2
OBSERVED INSTALLED FIXED MONORAIL MULTIPOINT SUSPENDED SCAFFOLD ON SITE-UPON CHECKING DOB RECORDS-NO NOTIFICATION FOR FIXED/NON ADJUSTABLE SCAFFOLD PROVIDED TO DOB AS REQUIRED(ONLY COUNTERWEIGHTS/ADJUSTABLE SCA
#39557630X
Oct 14, 2026
IN VIOLATION
$2,500
Jul 27, 2026Construction CLASS - 2
RESPONDING TO AN INCIDENT, WHERE WORKER ISTVAN BENEDEK RESULTED IN INJURY HIS RIGHT LEG WHEN TESTING MATERIAL HOIST, INSPECTION REVEALED. CONTRACTOR FAILURE TO SAFEGUARD, NO MEANS AND METHODS HOW TO HANDLE MATE
#39557113H
May 10, 2027
PENDING
$5,000
Jul 27, 2026Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED: PRE-CAST (5' BY 5' APPROX.) PANEL INSTALLATION IN PROGRESS, USING CHAIN HOIST NOT SHOWING ON DRAWINGS. NO BLOW-UP DRAWINGS SECTION AND DETAILS FOR MANUAL RAIL SYSTEM. CREATING UN
#39557114J
May 10, 2027
$2,500
Jul 16, 2026Construction CLASS - 1
18-STORY NEW BUILDING, I OBSERVED FACADE WORK AT EXPOSURES 1 AND 2 USING A SUSPENDED SCAFFOLD WHILE WORKERS WERE BELOW WITHOUT OVERHEAD PROTECTION OR A CONTROLLED ACCESS ZONE. THIS CREATED A HAZARDOUS CONDITION
#39556722Z
Apr 6, 2027
$10,000
Apr 29, 2026Unknown CLASS - 1
AT THE TIME OF MY INSPECTION OF A 18 STORY NEW BUILDING,RESPONDING TO AN INCIDENT REPORTED BY LOCAL 79 THAT WORKER GOT INJURED. I OBSERVED SUSPENDED SCAFFOLD INSTALLED AT EXPOSURE #1,2,3,4,UPON SCANNING OF 1 SC
#39553639Y
Jan 28, 2027
$5,000
Apr 29, 2026Construction CLASS - 1
AT THE TIME OF MY INSPECTION, RESPONDING TO AN INCIDENT REPORTED BY LOCAL 79 THAT WORKER GOT INJURED. INVESTIGATION REVEAL THAT INCIDENT OCCURRED FROM 04-22-2026. INJURED WORKER WAS WAITING FOR THE ELEVATOR AT
#39553638M
Jan 28, 2027
$5,000
May 16, 2025Construction CLASS - 2
FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE, 18 STORY NEW BUILDING COMPLETED TO BULKHEAD. OBSERVED AT FLOORS 17TH, 18TH
#35693669Y
Mar 11, 2027
$1,250
May 16, 2025Construction CLASS - 1
BC 2104.5. FAILURE TO PROVIDE MASONRY CMU BLOCK WALL CONSTRUCTION BRACING ACCORDANCE WITH TMS 602/ACI 530.1 ASCE 6 SECTION 3.3E. AS NOTED ATTIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE 18 STORY NEW BUILDIN
#35693667K
Mar 11, 2027
$2,500
Nov 9, 2021Construction CLASS - 2
NOTED: OBSERVED THROUGHOUT ENTIRE BUILDING AT EACH FLOOR MORE THAN 20 EXISTING EMERGENCY LIGHTS WERE NOT OPERATIONAL WHEN TESTED., REPAIR/REPLACE LIGHTING
#39050848X
Nov 12, 2021
POP/IN-VIO
$0
Nov 9, 2021Construction CLASS - 2
NOTED: OBSERVED THROUGHOUT CELLAR AT VARIOUS LOCATIONS, SPALLING AND MISSING CONCRETE EXPOSING RE-BARS AND STEEL BEAMS OF THE CEILING SLAB, ALSO COMPROMISING FIREPROOFING OF STEEL BEAMS., REPAIR AND/OR REPLACE
#39050846M
Nov 12, 2021
POP/IN-VIO
$0
Nov 9, 2021Construction CLASS - 2
NOTED: BUILDING ALTERED/CHANGED FROM A MEDICAL FACILITY AND NOW OCCUPIED AS A HOMELESS SHELTER CONTRARY TO CERTIFICATE OF OCCUPANCY #214644., OBTAIN A VALID C OF O OR DISCONTINUE ILLEGAL OCCUPANCY
#39050847Y
Nov 12, 2021
POP/IN-VIO
$0
Sep 28, 2021Construction CLASS - 1
WORK WITHOUT A PERMIT.
#39048328J
Oct 15, 2021
POP/IN-VIO
$0
Sep 28, 2021Boilers CLASS - 2
UNREGISTERED BOILER.
#39048327H
Oct 15, 2021
POP/IN-VIO
$0
Sep 23, 2021Elevators CLASS - 1
UPON INSPECTION DEVICE WAS FOUND OUT OF SERVICE. RESTORE TO SERVICE IMMEDIATELY AND CONTACT THE DOB AT EIR@BUILDINGS.NYC.GOV FOR A COMPLETE INSPECTION.
#39048032K
Oct 15, 2021
POP/IN-VIO
$0
Sep 23, 2021Elevators CLASS - 1
UPON INSPECTION DEVICE WAS FOUND OUT OF SERVICE. RESTORE TO SERVICE IMMEDIATELY AND CONTACT DOB AT EIR@BUILDINGS.NYC.GOV FOR A COMPLETE INSPECTION.
#39048031Z
Oct 15, 2021
POP/IN-VIO
$0
Mar 2, 2020Unknown CLASS - 1
I OBSERVED EXPOSED CURRENT CARRYING CONDUCTORS AND DANGEROUS WIRING METHODS OF EQUIPMENTS, WAS INSTALLED AT BASEMENT AND ROOF LOCATION. ENERGIZED WIRES PROTRUDING FROM RIDGED CONDUIT RUNNING HORIZONTAL ON PARAP
#39019843L
Apr 8, 2020
POP/IN-VIO
$0
Mar 2, 2020Construction CLASS - 2
FAILURE TO MAINTAIN THE BUILDING IN CODE COMPLIANT MANNER- OBSERVED AT THE ABOVE ADDRESS NO VENTILATION IN GAS METER ROOMS LOCATED THE BASEMENT/CELLAR., REPAIR AND/OR REPLACE
#39018732Y
Mar 16, 2020
POP/IN-VIO
$0
Mar 2, 2020Construction CLASS - 2
FAILURE TO MAINTAIN THE BUILDING IN CODE COMPLIANT MANNER- OBSERVED AT THE ABOVE ADDRESS SPRINKLER HEAD LOCATED ON THE 6 FLOOR STAIRWAY INSTALLED INCORRECTLY( SPRINKLER INSTALLED INTO THE CEILING)., REPAIR AND/
#39018731M
Mar 16, 2020
POP/IN-VIO
$0
Aug 21, 2019Construction CLASS - 2
I OBSERVED NO VENTILATION IN THE GAS METER ROOM LOCATED IN THE BASEMENT. , REPAIR AND/OR REPLACE
#39008575K
Sep 5, 2019
POP/IN-VIO
$0
May 1, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #353728542 ISSUED ON 11/20/18 AND TO FILE A CERT.OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REM:COMPLY WITH COMMISSIONER'S
#35398448Z
Oct 7, 2019
POP/IN-VIO
$0
Mar 4, 2019Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: OBSERVEDTHROUGHOUT CELLAR, SPALLING CONCRETE OF CEILING SLAB THROUGHOUT CELLAREXPOSING RE-BARS, METAL LATHE AT AREAS THAT PCS HAVE FALLEN OFF.RMDY:
#35383804Y
Jul 1, 2019
POP/IN-VIO
$0
Mar 4, 2019Construction CLASS - 3
FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. OBSERED ON 3/4/19 AT ABOVE ADDRESS CRACKED SIGHT GLASS ON 2 OUT OF 3 BOILERS. RMDY: REPAIR AND OR REPLACE. *PHOTOS TAKEN
#35386215J
Jul 1, 2019
POP/IN-VIO
$0
Mar 4, 2019Construction CLASS - 3
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED N 3/4/19 AT ABOVE ADDRESS ZIP SCREWS USED ON DRYER FL. RMDY: REPAIR AND REPLACE. *PHOTOS TAKEN.
#35386213X
Jul 1, 2019
POP/IN-VIO
$0
Mar 4, 2019Construction CLASS - 2
ALTERED/CHANGED BUILDING OCCUPIED W/O A VALID CERTIFICATE OF OCCUPANCYAS PER 28-118.3.1, 28-118.3.2. BUILDING ALTERED FROM A MEDICAL LABORA TORY INTO A HOMELSS SHELTER, COFO #214644 INDICATES PREMISE TO BE FOR
#35383803M
Jul 1, 2019
POP/IN-VIO
$0
Mar 1, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35372854Z ISSUED ON 01/20/2018, AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01 TEST STATION FOR SPRINKL
#35395279N
Jul 1, 2019
POP/IN-VIO
$0
Feb 13, 2019Elevators CLASS - 2
52BB12; 52,BB,12 RESHACKLE HOIST ROPES TAG EXPIRED.
#38268262Y
Aug 5, 2019
POP/IN-VIO
$0
Jan 11, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35372854Z ISSUED ON 11/20/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201 AND 1RCNY 102-01.NOTE:NO DOCUMENT FILE FOR
#35391075N
Apr 15, 2019
DEFAULT
$0
Nov 20, 2018Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED ON THE TOP FL NO PRESSURE GAUGE INSTALLED ON THE INSPECTOR TEST STATION FORTHE AUTOMATIC FIRE SPRINKLER SYSTEM AND IN STAIRWELL 4B A FIRE SPRINKL
#35372854Z
Jan 28, 2019
POP/IN-VIO
$0
Aug 15, 2018Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NO FIRE STOPPING PERBC 712.3;27-345.NOTED:OBSERVED AT CELLAR-GAS METER ROOM HAVE PIPES PENETRATING INTO ADJACENT ROOMS AND AREAS,HOLES/OPENINGS IN WALLS WITH NO
#35347504Y
Nov 5, 2018
POP/IN-VIO
$0
Aug 15, 2018Construction CLASS - 2
BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1;28-118.3.2.NOTED:C OF O #214644 STATES PREMISE TO BE FOR LABORATORIES,A MORGUE,AN AUTOPSY ROOM,MUSEUM,STERILIZING ROOM,LOCKER ROOMS N
#35347506H
Nov 5, 2018
POP/IN-VIO
$0
Aug 15, 2018Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:OBSERVED THROUGHOUT CELLAR,CONCRETE CEILING HAS SPALLING CONCRETE,MISSING CONCRETE AT VARIOUS LOCATIONS THROUGHOUT CELLAR EXPOSING RE-ENFORCEMENTS STE
#35347505X
Nov 5, 2018
POP/IN-VIO
$0
May 18, 2018Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #812642.REM:SUBMIT REQUIRED TECHNICAL REPORT.
#37010194R
Sep 10, 2018
POP/IN-VIO
$0
Mar 30, 2018Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT TOP OF STAIRWELL NO PRESSURE GAUGE INSTALLED ON THE INSPECTION TEST VALVE AND A FIVE SPRINKLER HEAD PAINTED IN STAIRWELL 412.PREVIOUS SUMMONS #3
#35325223K
Jul 2, 2018
POP/IN-VIO
$0
Feb 16, 2018Elevators CLASS - 2
97##5 FAILURE TO MAINTAIN ELEVATOR RESPODENT FAILED TO ALLOW MANDATORY ANNUAL/ROUTINE INSPECTION BY THE DEPT OR APPROVED AGENCY PER 28-304.16.1 AND APPENDIX K OF THE BUILDING CODE. MULTIPLE ATTEMPTS TO GAIN
#38261194J
Jul 16, 2018
POP/IN-VIO
$0
Jan 17, 2018Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED ON 01/17/18 AT ABOVE ADDRESS PREVIOUSLY USED SPRINKLER HEADS MIXED IN WITH UNUSED SPRINKLER HEADS. ALSO, NO INSPECTOR'S TEST GAUGE OR VALVE ON UPP
#35298014N
Apr 9, 2018
POP/IN-VIO
$0
Jan 17, 2018Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED ON 01/17/18 AT THE ABOVE ADDRESS SPRINKLER HEADS THROUGHOUT BUILDING ARE TOO CLOSE TO THE LIGHT FIXTURES, OBSTRUCTING THE SPREAD OF WATER. REM: RE
#35298013L
Apr 9, 2018
POP/IN-VIO
$0
Dec 20, 2017Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT TOPOF STAIRWELL NO GAUGE INSTALLED AT THE INSPECTOR'S TEST AND A FIRE SPRINKLER HEAD PAINTED IN STAIRWELL 4B. PREVIOUS SUMMONS #35289862L
#35311102R
Apr 9, 2018
POP/IN-VIO
$0
Oct 11, 2017Elevators CLASS - 2
97##5.FAILURE TO MAINTAIN ELEVATOR DEVICE.RESPONDENT FAILED TO ALLOW MANDATORY ANNUAL/ROUTINE INSPECTION BY THE DEPARTMENT PER 28-304.6.1. &APPENDIX K OF BUILDING CODE.MULTIPLE ATTEMPT TO GAIN ACCESS TO PERFORM
#38259566Z
Feb 5, 2018
POP/IN-VIO
$0
Aug 15, 2017Construction CLASS - 2
BLDG OCCUPIED W/O A VALID C OF O AS PER 28-118.3.1 - 28-118.3.2. NOTED: C OF O #214644 ISSUED 9/7/1976, STATES PREMISE TO BE LABORATORIES, MORQUE, AUTOPSY ROOM, MUSEUM, STERILIZING, ANTMAL & LOCKER ROOMS - NOW
#35287318Z
Dec 11, 2017
POP/IN-VIO
$0
Aug 15, 2017Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBSERVED @ TOP OF STAIRWELL NO PRESSURE GAUGE INSTALLED ON INSPECTION'S TEST STATION AS IS REQUIRED. ALSO IN STAIRWELL 4B FIRE SPRINKLER HEAD IS PAINTED WHICH
#35289858Z
Dec 11, 2017
POP/IN-VIO
$0
Aug 15, 2017Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NO FIRE STOPPING PER BC712.3; 27-345. NOTED: OBSERVED @ CELLAR WITHIN BOTH GAS METER ROOMS PIPE PENETRATIONS WITH NO FIRE STOPPING PROVIDED @ VARIOUS LOCATIONS
#35287320H
Dec 11, 2017
POP/IN-VIO
$0
Aug 15, 2017Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: OBSERVED @ CELLAR SPALLING CEMENT THAT HAS FALLEN @ VARIOUS LOCATIONS FROM CEILINGEXPOSING REINFORCEMENT STEEL. REMEDY: REPAIR &/OR REPLACE.
#35287319K
Dec 11, 2017
POP/IN-VIO
$0
Mar 9, 2017Construction CLASS - 2
FAILURE TO PROVIDE POWER FOR EMERGENCY LIGHTING. NOTED: AT 2ND STORY CORRIDOR OUTSIDE ROOM 206 EMERGENCY EXIT LIGHT INOPERABLE/NUT LIGHTING UP. REMEDY: PROVIDE ADEQUATE POWER FOR EMERGENCY LIGHTING.
#35229218X
May 8, 2017
POP/IN-VIO
$0
Mar 9, 2017Plumbing CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. RE: INSTALLATION/MAINTENANCE OF PLUMBING MATERIALS/EQUIPMENT PER P.C. 102.3; 27-902 MALLEABLE FITTINGS ON INSPECTORS TEST. ALSO INSPECTOR'S TEST DOESN'T HAVE A
#35235136N
May 8, 2017
POP/IN-VIO
$0
Aug 3, 2016Construction CLASS - 2
FAILURE TO MAINTAIN BLDG CODE COMPLIANT:LACK OF EMERGENCY LIGHTING PERBC1006.1; 27-542. NOTED: AT STAIRWAY "E", 4D,4A,3A INOPERATIVE EMERGENCY LIGHTING WITH BATTERY BACKUP. RMDY: COMPLY WITH CODE.
#35200753Z
Sep 12, 2016
POP/IN-VIO
$0
Mar 30, 2016Elevators CLASS - 2
05X10;17M07;18M07;28H11;59U15;64M07;70O02;67M07; 05-X-10 DOOR ZONE RESTRICTOR NOT WORKING. 17-M-07 HATCH MISSING GIB SHOES. 18-M-07 PROVIDE FIRE GIBS. 28-H-11 REPLACE WORN ROLLERS. 59-U-15 BRAKE MAINTENANCE TAG
#38241796Z
May 16, 2016
POP/IN-VIO
$0
Mar 30, 2016Elevators CLASS - 2
05E01;05X10;10H11;16M07;18M07;28H11;40Q13;59U15;64M07;70O02;67M07. 05-E-01 CAR DOOR ARE RUBBING. 05-X-10 DOOR RESTRICTOR NOT WORKING. 10-H-11 REPLACE DOOR GIBS. 16-M-07 GIB MISSING. 18-M-07 PROVIDE FIRE GIBS.
#38241795R
May 16, 2016
POP/IN-VIO
$0
May 3, 2013Elevators CLASS - 2
97**FAILURE TO MAINTAIN ELEVATOR DEVICE.RESPONDENT FAILED TO PROVIDE PROPER ACCESS IN ORDER THAT THE DEPT CAN PERFORM PERIODIC INSPECTIONS PER 28-304.6 AND APPENDIX K OF THE BLDG CODE.RESPONDENT FAILED TO PROV
#38227090X
Jun 17, 2013
POP/IN-VIO
$0
Jun 13, 2002Construction Non-Hazardous
ALTERED BUILDING OCCUPIED WITHOUT VALID COFO TEMPORATY COFO# 300765900 ISSUED 1/30/02 HAS EXPIRED 4/30/02 REMEDY; OBTAIN VALID COFO.
#34322583Y
Jul 29, 2002
WRITTEN OFF
$0
Dec 5, 1996Construction Hazardous
FAILURE TO MAINTAIN BUILDING DEFECTS ARE NO FIRE ALARM SYSTEM DEFECTIVE FIRE ALARM SYSTEM @ 1ST FKR OF MEN'S SHELTER OCCUPANCY OF MORE THAN 100 PERSONS AT TIME OF INSPECTION (BUILDING 1) REMEDY: RESTORE FIRE
#34147289H
Mar 3, 1997
WRITTEN OFF
$0
Jun 2, 1995Construction Hazardous
FAILURE TO MAINTAIN THE INTERIOR FIRE ALARM SYSTEM:INOPERATIVE FIRE ALARM SYSTEM AT THE FIRST FLOOR AREA OF BLDG #1.REMEDY:IMEDIATELY PROVIDE A WORKING SIGNAL SYSTEM AS PER CODE.
#34126196X
Aug 7, 1995
WRITTEN OFF
$0
DOB (43)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#01553
DOB VIOLATION - ACTIVE
May 6, 2021ELEVATOR

#9027/701199
DOB VIOLATION - ACTIVE
Jul 21, 2020ELEVATOR

#9027/685477
DOB VIOLATION - ACTIVE
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#05170
DOB VIOLATION - ACTIVE
Sep 15, 2017ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
#06118
DOB VIOLATION - ACTIVE
Feb 6, 2017ELEVATOR

#9027/596359
DOB VIOLATION - ACTIVE
Dec 1, 2016ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST
#04907
DOB VIOLATION - ACTIVE
Jun 1, 2016NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#03262
DOB VIOLATION - ACTIVE
Jun 10, 2015ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST
#05036
DOB VIOLATION - ACTIVE
Oct 31, 2014ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
#05783
DOB VIOLATION - ACTIVE
Oct 31, 2014ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST
#05782
DOB VIOLATION - ACTIVE
Mar 31, 2014ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
#08600
DOB VIOLATION - ACTIVE
Mar 31, 2014ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST
#08601
DOB VIOLATION - ACTIVE
Oct 1, 2012ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
#02919
DOB VIOLATION - ACTIVE
Aug 13, 2010ELEVATOR

#9027/348318
DOB VIOLATION - ACTIVE
May 24, 2010ELEVATOR

#9027/338260
DOB VIOLATION - ACTIVE
Feb 27, 2009LOCAL LAW 10/81 - ELEVATOR

#02452
DOB VIOLATION - ACTIVE
Oct 21, 2008ELEVATOR

#9011/281987
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Mar 21, 2008LOCAL LAW 10/81 - ELEVATOR

#02840
DOB VIOLATION - ACTIVE
Apr 2, 2007LOCAL LAW 10/81 - ELEVATOR

#02832
DOB VIOLATION - ACTIVE
Nov 28, 2006ELEVATOR

#9011/182177
DOB VIOLATION - ACTIVE
Oct 1, 2005LOCAL LAW 10/81 - ELEVATOR

#03402
DOB VIOLATION - ACTIVE
Nov 19, 2004LOCAL LAW 10/81 - ELEVATOR

#02489
DOB VIOLATION - ACTIVE
Apr 21, 2004LOCAL LAW 10/81 - ELEVATOR

#02757
DOB VIOLATION - ACTIVE
Mar 21, 2003LOCAL LAW 10/81 - ELEVATOR

#02279
DOB VIOLATION - ACTIVE
Feb 19, 2002LOCAL LAW 10/81 - ELEVATOR

#02765
DOB VIOLATION - ACTIVE
Mar 8, 2001LOCAL LAW 10/81 - ELEVATOR

#02397
DOB VIOLATION - ACTIVE
Mar 10, 2000LOCAL LAW 10/81 - ELEVATOR

#02581
DOB VIOLATION - ACTIVE
Jan 20, 1999LOCAL LAW 10/81 - ELEVATOR

#02446
DOB VIOLATION - ACTIVE
Jan 6, 1998LOCAL LAW 10/81 - ELEVATOR

#02186
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#02967
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#02994
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#02968
DOB VIOLATION - ACTIVE
Mar 8, 1996LOCAL LAW 10/81 - ELEVATOR

#02459
DOB VIOLATION - ACTIVE
Apr 17, 1995LOCAL LAW 10/81 - ELEVATOR

#03092
DOB VIOLATION - ACTIVE
May 31, 1994LOCAL LAW 10/81 - ELEVATOR

#03677
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#19046
DOB VIOLATION - ACTIVE
Jun 28, 1993LOCAL LAW 10/81 - ELEVATOR
1
#03240
DOB VIOLATION - ACTIVE
Apr 7, 1992LOCAL LAW 10/81 - ELEVATOR
1
#03959
DOB VIOLATION - ACTIVE
Apr 25, 1991LOCAL LAW 10/81 - ELEVATOR
1
#02527
DOB VIOLATION - ACTIVE
Jun 29, 1990LOCAL LAW 10/81 - ELEVATOR
3
#03605
DOB VIOLATION - ACTIVE
Jun 29, 1990LOCAL LAW 10/81 - ELEVATOR
1
#03606
DOB VIOLATION - ACTIVE
Oct 12, 1989LOCAL LAW 10/81 - ELEVATOR
1
#04771
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 28, 2026ECBConstruction: MONORAIL SUSPENDED SCAFFOLD SYSTEM INSTALLED CONTRARY TO PLANS-ATTACHMENT OF BEAMS TO CONCRETE SLAB-USING CHOKE/SLING LINES-AS PER PLAN 5/16" WIRE ROPE WITH J-BOLTS AT TOP AND BOTTOM ,TIMBLE,SHACKLE TO BE USED,Open
Jul 28, 2026ECBConstruction: AT TIME OF INSPECTION, DURING A DEPARTMENT-ISSUED HIGH WIND ADVISORY, OBSERVED A SUSPENDED SCAFFOLD PLATFORM LANDED ON THE EDGE OF THE SEVENTH-FLOOR BALCONY WITHOUT PROTECTION AND NOT SECURED AS REQUIRED BY THEClosed
Jul 28, 2026ECBConstruction: AT THE TIME OF MY INSPECTION -OBSERVED OUTRIGGER BEAM SUSPENDED SCAFFOLD INSTALLED AT EXP#2(ROOF) WITH TIEBACK INSTALLED TO ANGLE ANCHORAGE SYSTEM ON CONCRETE WALL-NO PULL TEST PERFORMED/PROVIDED AS REQUIRED-STClosed
Jul 28, 2026ECBCranes and Derricks: OBSERVED INSTALLED FIXED MONORAIL MULTIPOINT SUSPENDED SCAFFOLD ON SITE-UPON CHECKING DOB RECORDS-NO NOTIFICATION FOR FIXED/NON ADJUSTABLE SCAFFOLD PROVIDED TO DOB AS REQUIRED(ONLY COUNTERWEIGHTS/ADJUSTABLE SCAOpen
Jul 27, 2026ECBConstruction: RESPONDING TO AN INCIDENT, WHERE WORKER ISTVAN BENEDEK RESULTED IN INJURY HIS RIGHT LEG WHEN TESTING MATERIAL HOIST, INSPECTION REVEALED. CONTRACTOR FAILURE TO SAFEGUARD, NO MEANS AND METHODS HOW TO HANDLE MATEOpen
Jul 27, 2026ECBConstruction: AT TIME OF INSPECTION OBSERVED: PRE-CAST (5' BY 5' APPROX.) PANEL INSTALLATION IN PROGRESS, USING CHAIN HOIST NOT SHOWING ON DRAWINGS. NO BLOW-UP DRAWINGS SECTION AND DETAILS FOR MANUAL RAIL SYSTEM. CREATING UNClosed
Jul 16, 2026ECBConstruction: 18-STORY NEW BUILDING, I OBSERVED FACADE WORK AT EXPOSURES 1 AND 2 USING A SUSPENDED SCAFFOLD WHILE WORKERS WERE BELOW WITHOUT OVERHEAD PROTECTION OR A CONTROLLED ACCESS ZONE. THIS CREATED A HAZARDOUS CONDITIONClosed