16 floors · 255,763 sq ft · built 1958 · class RC · owner of record: 125 Maiden Lane Condo
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 255,763 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 792 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 70). Agency page | Dec 31, 2030 in 1522 days | Next due 2030 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-08 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $309,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2025-11-17) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 24, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, ACCESS WAS GAINED TO THE BUSINESS SPACE. WORK APPEARS TO BE COMPLETED. NOTICED, PLUMBING WORK DONE FOR THE FACIAL ROOMS. NEW WASH BASINS INSTALLED AT HEAD OF BEDS IN THE GROUND FLOOR SPA. #39178160K | Apr 26, 2027 DEFAULT | $3,750 |
| Apr 25, 2024 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED STORE FRONT AT WATER STREET IS LABELED "150 WATER STREET" . HOWEVER BUILDING UNDER BIN #1087484/ 1805565 INDICATE AKA AS 1-15 FLETCHER STREET, 1 #39112720H | Jul 11, 2024 DEFAULT | $500 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302,4 FOR CONTROL #900197. REMEDY: SUBMIT ACCEPATBLE REQU #37027889Y | Aug 22, 2024 DEFAULT | $6,250 |
| Jul 13, 2020 | Construction CLASS - 2 A.C.#27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1,2019,IN AN OFFICE BLDG 100 FT OR #37019935X | Dec 9, 2021 IN VIOLATION | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #02040 | DOB VIOLATION - ACTIVE |
| Dec 12, 2011 | ELEVATOR #9027/409457 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 1:36 PM ET. BBL 1000707501.