20open violations
$17,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 49 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 49 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 65 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 40,110 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 170 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 170 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $21,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 466 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1145 days
Next cycle year 2029

Open violations

ECB / OATH (4) · $17,500 owed
IssuedViolationHearingBalance
Nov 4, 2026Unknown CLASS - 2
AT THE TIME OF INSPECTION, OBSERVED MISSING VERTICAL DEBRIS NETTING AT PORTIONS OF THE SUPPORTED SCAFFOLD. THE OPENINGS EXPOSE WORKERS AND PEDESTRIANS TO FALLING DEBRIS. MAINTAIN VERTICAL DEBRIS NETTING ON SUPP
#39561499L
Jan 14, 2027
PENDING
$2,500
Oct 13, 2026Unknown CLASS - 1
FAILED TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY/INJURY. AT TIME OF MY INSPECTION, UPON REVIEW OF DEPT RECORDS IT REVEALS THAT THERE WAS NO ELECTRONICALLY FILING OF AN INCIDENT WITHIN 3 BUSI
#39560464R
Dec 17, 2026
PENDING
$10,000
Sep 24, 2026Unknown CLASS - 1
RESPONDING TO AN INCIDENT WHERE A WORKER GOT INJURED ON HIS RIGHT HAND. UPON REVIEWING THE PRE-SHIFT SAFETY MEETING, INSPECTIONS REVEALED THAT THE SPECIFIC SAFETY CONCERNS OR RISKS ASSOCIATED WITH THE DEMOTION
#39559602H
Dec 3, 2026
PENDING
$5,000
Jul 13, 2026Unknown CLASS - 2
FAILURE TO MAINTAIN PARKING STRUCTURE INSAFE CONDITION. AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURE CONSISTING OF 01 LEVEL BELOW GRADE, OBSERVED CRACKED/SPALLED CONCRETE CEILING AND SPALLED CONCRETE
#35730088X
Sep 17, 2026
ADMIT/IN-VIO
$0
DOB (1)
IssuedViolationStatus
Jun 4, 1991CONSTRUCTION

#D1LB05
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (15)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Dec 4, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A parking structures compliance report by 12/31/2023, as required per 1 RCNY 103-13.
Active
Nov 25, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A compliance report by 12/31/2023
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Nov 4, 2026ECBUnknown: AT THE TIME OF INSPECTION, OBSERVED MISSING VERTICAL DEBRIS NETTING AT PORTIONS OF THE SUPPORTED SCAFFOLD. THE OPENINGS EXPOSE WORKERS AND PEDESTRIANS TO FALLING DEBRIS. MAINTAIN VERTICAL DEBRIS NETTING ON SUPPOpen
Oct 13, 2026ECBUnknown: FAILED TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY/INJURY. AT TIME OF MY INSPECTION, UPON REVIEW OF DEPT RECORDS IT REVEALS THAT THERE WAS NO ELECTRONICALLY FILING OF AN INCIDENT WITHIN 3 BUSIOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Sep 24, 2026ECBUnknown: RESPONDING TO AN INCIDENT WHERE A WORKER GOT INJURED ON HIS RIGHT HAND. UPON REVIEWING THE PRE-SHIFT SAFETY MEETING, INSPECTIONS REVEALED THAT THE SPECIFIC SAFETY CONCERNS OR RISKS ASSOCIATED WITH THE DEMOTIONOpen

Check the agency records