Manhattan · Block 449 · Lot 33 · 10003

125 1 Avenue

5 floors · 4 apartments · 4,440 sq ft · built 1900 · class S4 · owner of record: 125- 127 1st Avenue, Llc.

3open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
60dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 304 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 791 days
Next cycle year 2028

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Aug 12, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. FIVE STORY, MID-BLOCK AND MIXED USE BUILDING. OBSERVED THE RIGHT SIDE OF EXPOSURE 1MASONRY BRICK BULGING OUT AROUND THE 4TH AND 5TH FLOOR. LOOSE VERTICLE
#35719081X
Dec 3, 2026
$1,250
DOB (1)
IssuedViolationStatus
Aug 12, 2025CONSTRUCTION
CORRECTIVE ACTION PLAN REQ'D-OBSVD THE RIGHT SIDE OF EXP1 MASONRY BRICK WALL BULGING OUT AROUND THE 5TH & 4TH FLR. LOOSE VERT RIGHT SIDE WINDOW JAM LOCATED @ TOP RIGHT WINDOW(5FL)SHOWING SIGNS OF IMMENET SEPARATION. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO SUBMIT CORRECTIV
#PI10303HZ
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (2) · C 0 · B 2 · A 0
IssuedClassViolationCorrect by
Apr 7, 2014BApt 4 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4, 5th STORY, 1st APARTMENT FROM WEST AT NORTHMay 12, 2014
Apr 21, 1998BSECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR 2 STY PUBLIC HALL AT WEST.Jun 8, 1998

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 11:36 AM ET. BBL 1004490033.

Look up another building